Safe Routes to School Program
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.
The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.
38 of 205 projects · Biking: Adds or improves bike lanes, cycle tracks or bike routes. · Clear filters
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Southeast Evergreen Highway, Southeast Chelsea Avenue to Southeast Image Road, Vancouver
Upgrade roadway with a 6 to 10 foot pedestrian pathway on the south side, a priority east-west walking and biking corridor.
$4.0M · 63% secured · Grant, Local
1.1 mi route · 62 crossings (62 unmarked) · 0 curb ramps
Fourth Plain Boulevard, Vancouver
Traffic calming, lighting and pedestrian infrastructure on neighborhood streets in central Vancouver.
$4.3M · 94% secured · ARPA
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail, Vancouver
Adds a designated crossing of Hazel Dell Avenue connecting the city and county segments of the Burnt Bridge Creek Trail.
$1.0M · 70% secured · Grant, Local
0.2 mi route · 10 crossings (9 unmarked) · 1 curb ramp
Southeast McGillivray Boulevard, Southeast Chkalov Drive to Southeast 164th Avenue, Vancouver
Complete street safety improvements for walking, biking and mobility devices on McGillivray Boulevard, done with the planned repaving.
$7.5M · Local
2.6 mi route · 75 crossings (43 unmarked) · 7 curb ramps
Stapleton Road, SR 500 to Northeast 18th Street, Vancouver
Restripes Stapleton Road to remove the center turn lane and add buffered bike/mobility lanes in both directions.
$1.0M · 80% secured · SS4A
Main Street, East 39th Street to Northeast 45th Street, Vancouver
Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.
$4.0M · 38% secured · Local, Grant
0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp
Heights District Grand Loop, Vancouver
Complete street enhancements on two segments of the Grand Loop, a pedestrian-focused street and linear park in the Heights District.
$21.8M · 100% secured · RAISE, Local
Northeast 52nd Street at Northeast 135th Avenue, Vancouver
High-visibility crosswalk, RRFB, signage, crossing and segment lighting, and curb extension at Image Elementary School.
$292K · 100% secured · Safe Routes to School, SRTS
Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing citywide program budgeted at $1.5 million per year to fix safety and accessibility problems for people walking, biking and rolling.
$9.0M · Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 18th Street, Vancouver
RRFBs, refuge islands, speed feedback signs, bike lanes, sidewalk and lighting on NE 112th Avenue.
$1.8M · 100% secured · WSDOT
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing traffic calming program with education or infrastructure to reduce driver speeds and new or improved facilities for people walking, biking and using mobility devices. Annual budget $300,000.
$1.8M · Dedicated Street Funding, Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 28th Street, Vancouver
Repave and rechannelize to one general purpose lane plus a center turn lane, adding buffered/protected mobility lanes between Mill Plain and 18th Street.
$3.5M · 100% secured · Grant, Local
Northeast 72nd Avenue, Northeast 40th Street to Northeast 78th Street, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.5M · Local
1.9 mi route · 81 crossings (66 unmarked) · 15 curb ramps
Northeast 87th Avenue, Fourth Plain Boulevard to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$2.1M · Local
154 ft route · 4 crossings (4 unmarked) · 0 curb ramps
Northeast 97th Avenue, Northeast Burton Road to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.7M · Local
0.4 mi route · 7 crossings (7 unmarked) · 0 curb ramps
Northeast 72nd Avenue, Northeast 54th Street to Northeast 60th Street, Vancouver
High-visibility crosswalks, lighting, ADA ramps, accessible signals, buffered sidewalk and speed cushions along NE 72nd Avenue at Walnut Grove Elementary.
$2.0M · 100% secured · SRTS, Safe Routes to School
0.3 mi route · 18 crossings (14 unmarked) · 4 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 113 ↗Vancouver 2027-2032 TIP (adopted), p. 46 ↗
Northeast 112th Avenue, Northeast 28th Street to Northeast 51st Street, Vancouver
Repave and restripe NE 112th Avenue to add bike and small mobility lanes, a neighborhood greenway alternate route with traffic calming and wayfinding, shared lane markings, and a long-term two-way shared use path on the east side.
$4.0M · Local
Southeast Chkalov Drive, Southeast 3rd Street to Southeast McGillivray Boulevard, Vancouver
Road reconfiguration with protected bike and small mobility lanes, enhanced pedestrian crossing, signal modification and ADA ramps.
$1.3M
0.3 mi route · 11 crossings (2 unmarked) · 1 curb ramp
East 29th Street, I-5 to Neals Lane, Vancouver
Lower speed limit, add speed cushions, shared lane markings, traffic circles, an improved Grand Boulevard crossing with pedestrian island and bike crossing, fill sidewalk gaps and add wayfinding.
$700K
1.3 mi route · 79 crossings (72 unmarked) · 6 curb ramps
East 33rd Street, I-5 to Grand Boulevard, Vancouver
Repave and restripe East 33rd Street with lower speed limits, buffered mobility lanes, an RRFB with raised crossing at F Street, speed humps, shared lane markings and intersection improvements at Grand.
$2.0M
1.0 mi route · 71 crossings (50 unmarked) · 18 curb ramps
Northeast 112th Avenue, Northeast 18th Street to Northeast 51st Street, Vancouver
Off-street multimodal path along the east side of NE 112th Avenue.
$8.5M
Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver
Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.
$4.5M
115 ft route · 4 crossings (4 unmarked) · 2 curb ramps
Southeast Evergreen Highway, Southeast Image Road to Southeast 100th Court, Vancouver
Adds a 6 to 10 foot pedestrian pathway on the south side of SE Evergreen Highway, a priority east/west walking and biking corridor. Design and right-of-way funded; construction unfunded.
$1.0M
0.4 mi route · 47 crossings (47 unmarked) · 1 curb ramp
West 11th Street, Vancouver
Multimodal grade-separated crossing of the railroad at West 11th Street to improve safety.
$2.5M
0.7 mi route · 40 crossings (19 unmarked) · 5 curb ramps
Downtown Vancouver westside, Vancouver
Further phases of traffic calming, mobility lanes and pedestrian improvements across west downtown Vancouver after the Columbia corridor phase. Outside 6-year horizon.
$5.0M
Carty Road at Hillhurst Road, Ridgefield
First phase of a multipurpose trail along Carty Road, including design, acquisition and construction of an enhanced crosswalk with RRFB at Hillhurst and Carty Road.
$278K · 42% secured · Local, State Capital grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
South Hillhurst Road at South Sevier Road, Ridgefield
New multimodal trail on the north side of S Hillhurst Road from S Sevier Road to Ridgefield High School.
$446K · 100% secured · TA(US), Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Carty Road at Hillhurst Road, Ridgefield
Multipurpose trail along Carty Road from Hillhurst Road east for about half a mile.
Developer, Bike/Ped/Trail grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Gee Creek Trail, Abrams Park to Royle Road, Ridgefield
Extends the Gee Creek regional multi-use trail from Abrams Park to Royle Road, with slope stabilization.
$4.0M · State RCO, State/Federal Bike/Pedestrian, REET, Local
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Gee Creek Trail, Heron Drive to Main Avenue, Ridgefield
Extends Gee Creek Trail north and west from Heron Drive to Main Avenue near the Ridgefield Wildlife Refuge Carty Unit, plus preliminary design of a multimodal BNSF rail crossing along Division Street to the waterfront.
FLAP, TIF, Developer, State/Federal
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail
Trail crossing of NE Hazel Dell Avenue for the Burnt Bridge Creek Trail near 5200-5400 NE Hazel Dell Ave.
$286K · CRF
0.1 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗
Southeast Crown Road, Southeast 23rd Street to West Fir Court
Separated pedestrian and bicycle facilities, ADA ramps, RRFBs and school crossing upgrades.
$5.2M · 97% secured · TA(UL), CMAQ, Local
Show on the mapClark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Northeast 3rd Avenue, Northeast Garfield Street to Northeast Lechner Street, Camas
Road diet with buffered bike lanes, some with vertical delineation, speed feedback signs, signal modifications and ADA accessibility.
$3.3M · 100% secured · HSIP, Local
1.7 mi route · 56 crossings (38 unmarked) · 11 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Camas
Citywide shared path improvements including NW Norwood Dr.
$250K
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 8 ↗
39th Street, Evergreen Way to J Street, Washougal
Safe routes to school project with lane narrowing, sidewalks, buffered bike lanes, high-visibility crosswalks with rapid flashing beacons, ADA ramps, speed humps and safety education.
$2.6M · 85% secured · SRTS, Local
0.5 mi route · 21 crossings (15 unmarked) · 1 curb ramp
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
South 27th Street, Main Street to Index Street, Washougal
New separated shared use path along the east side of 27th Street between Main Street and Index Street.
$2.6M · 81% secured · TA(UL), Local
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
La Center Road at Paradise Park Road, La Center
10-foot-wide shared use path along La Center Road to the Lewis River bridge.
$8.6M · 9% secured · TA(R), Local
1.0 mi route · 15 crossings (15 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗