Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
15
Planned
$59.9M
On agendas
0
  • Funded, phase unclear 15

15 of 205 projects · Street rebuild: Rebuilds or widens a road or intersection and adds or rebuilds sidewalks, bike lanes or crossings with it. · Clear filters

Vancouver14 projects · $56.6M

  1. Funded, phase unclear2026–2027Street rebuildWalkingBikingStreet safety

    McGillivray Complete Street and Paving Project - Chkalov Drive to Southeast 164th Avenue

    Southeast McGillivray Boulevard, Southeast Chkalov Drive to Southeast 164th Avenue, Vancouver

    Complete street safety improvements for walking, biking and mobility devices on McGillivray Boulevard, done with the planned repaving.

    $7.5M · Local

    Sidewalks along the route today: 69% · both sides 59%OS-CONNECT, Nov 2026 ↗

    2.6 mi route · 75 crossings (43 unmarked) · 7 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  2. Funded, phase unclear2026–2027Street rebuildWalkingBikingTransitStreet safety

    Upper Main Street Complete Street and Paving Project - East 39th to Northeast 45th Street/Hazel Dell

    Main Street, East 39th Street to Northeast 45th Street, Vancouver

    Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.

    $4.0M · 38% secured · Local, Grant

    Sidewalks along the route today: 100% · both sides 73%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 47 ↗

  3. Funded, phase unclear2027–2029BikingStreet safetyStreet rebuildWalking

    Northeast 112th Avenue Complete Street and Paving Project - Mill Plain Boulevard to Northeast 28th Street

    Northeast 112th Avenue, Mill Plain Boulevard to Northeast 28th Street, Vancouver

    Repave and rechannelize to one general purpose lane plus a center turn lane, adding buffered/protected mobility lanes between Mill Plain and 18th Street.

    $3.5M · 100% secured · Grant, Local

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  4. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 72nd Avenue Safety and Mobility Complete Street

    Northeast 72nd Avenue, Northeast 40th Street to Northeast 78th Street, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $1.5M · Local

    Sidewalks along the route today: 96% · both sides 70%OS-CONNECT, Nov 2026 ↗

    1.9 mi route · 81 crossings (66 unmarked) · 15 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  5. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 86th/Northeast 87th Avenues Safety and Mobility Complete Street

    Northeast 87th Avenue, Fourth Plain Boulevard to Mill Plain Boulevard, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $2.1M · Local

    Sidewalks along the route today: 100% · both sides 80%OS-CONNECT, Nov 2026 ↗

    154 ft route · 4 crossings (4 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  6. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 97th/98th Avenues Safety and Mobility Complete Street

    Northeast 97th Avenue, Northeast Burton Road to Mill Plain Boulevard, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $1.7M · Local

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 7 crossings (7 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  7. Funded, phase unclear2028–2029BikingWalkingStreet rebuildStreet safety

    112th Avenue/Chkalov Drive Complete Street and Paving Project - Northeast 28th Street to Northeast 51st Street

    Northeast 112th Avenue, Northeast 28th Street to Northeast 51st Street, Vancouver

    Repave and restripe NE 112th Avenue to add bike and small mobility lanes, a neighborhood greenway alternate route with traffic calming and wayfinding, shared lane markings, and a long-term two-way shared use path on the east side.

    $4.0M · Local

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  8. 112th Avenue/Chkalov Drive Complete Street Project - Southeast 3rd Street to McGillivray Boulevard

    Southeast Chkalov Drive, Southeast 3rd Street to Southeast McGillivray Boulevard, Vancouver

    Road reconfiguration with protected bike and small mobility lanes, enhanced pedestrian crossing, signal modification and ADA ramps.

    $1.3M

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 11 crossings (2 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 160 ↗

  9. East 29th Street Complete Street and Paving Project

    East 29th Street, I-5 to Neals Lane, Vancouver

    Lower speed limit, add speed cushions, shared lane markings, traffic circles, an improved Grand Boulevard crossing with pedestrian island and bike crossing, fill sidewalk gaps and add wayfinding.

    $700K

    Sidewalks along the route today: 81% · both sides 65%OS-CONNECT, Nov 2026 ↗

    1.3 mi route · 79 crossings (72 unmarked) · 6 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 163 ↗

  10. East 33rd Street Complete Street & Paving Project

    East 33rd Street, I-5 to Grand Boulevard, Vancouver

    Repave and restripe East 33rd Street with lower speed limits, buffered mobility lanes, an RRFB with raised crossing at F Street, speed humps, shared lane markings and intersection improvements at Grand.

    $2.0M

    Sidewalks along the route today: 97% · both sides 94%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 71 crossings (50 unmarked) · 18 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 162 ↗

  11. Northeast 112th Avenue/Southeast Chkalov Drive Complete Street Project - Northeast 2nd Street to Southeast 3rd Street

    Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver

    Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.

    $4.5M

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    115 ft route · 4 crossings (4 unmarked) · 2 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 174 ↗

Camas1 project · $3.3M

  1. Funded, phase unclear2027–2029BikingStreet safetyStreet rebuild

    NE 3rd Avenue Roadway Reconfiguration

    Northeast 3rd Avenue, Northeast Garfield Street to Northeast Lechner Street, Camas

    Road diet with buffered bike lanes, some with vertical delineation, speed feedback signs, signal modifications and ADA accessibility.

    $3.3M · 100% secured · HSIP, Local

    Sidewalks along the route today: 100% · both sides 97%OS-CONNECT, Nov 2026 ↗

    1.7 mi route · 56 crossings (38 unmarked) · 11 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗