Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
21
Planned
$228M
On agendas
0
  • Planning 21

21 of 205 projects · Street rebuild: Rebuilds or widens a road or intersection and adds or rebuilds sidewalks, bike lanes or crossings with it. · Clear filters

Vancouver21 projects · $228M

  1. Fourth Plain Boulevard Safety and Mobility - 121st Avenue to 127th Avenue

    Fourth Plain Boulevard, Northeast 121st Avenue to Northeast 127th Avenue, Vancouver

    Safety improvements on a high-crash segment of Fourth Plain served by bus rapid transit, possibly including road reconfiguration, signal phasing changes, lighting and reduced crash exposure for vulnerable users. Outside 6-year horizon.

    $1.0M

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 135 ↗

  2. Northeast 104th Avenue - Southeast Mill Plain Boulevard to Northeast 14th Street

    Northeast 104th Avenue, Southeast Mill Plain Boulevard to Northeast 14th Street, Vancouver

    Upgrade to urban arterial with sidewalks, ADA ramps and mobility lanes. Outside 6-year horizon.

    $12.0M

    Sidewalks along the route today: 100% · both sides 45%OS-CONNECT, Nov 2026 ↗

    0.7 mi route · 38 crossings (27 unmarked) · 9 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 82 ↗

  3. Northeast 162nd Avenue - Southeast 1st Street to Northeast 9th Street

    Northeast 162nd Avenue, Southeast 1st Street to Northeast 9th Street, Vancouver

    Widen to 7-lane principal arterial with sidewalks, ADA ramps, mobility lanes and streetlights. Outside 6-year horizon.

    $13.0M

    Sidewalks along the route today: 85% · both sides 44%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 23 crossings (20 unmarked) · 7 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 71 ↗

  4. Northeast 18th Street - Northeast 164th Avenue to Northeast 192nd Avenue

    Northeast 18th Street, Northeast 164th Avenue to Northeast 192nd Avenue, Vancouver

    Upgrade of rural 2-lane arterial with added lanes, mobility lanes, north-side sidewalk and south-side shared use path. Outside 6-year horizon.

    $20.0M

    Sidewalks along the route today: 57% · both sides 24%OS-CONNECT, Nov 2026 ↗

    1.3 mi route · 29 crossings (26 unmarked) · 4 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 62 ↗

  5. Southeast 192nd Avenue and Mill Plain Boulevard Intersection Improvements

    Southeast 192nd Avenue at Mill Plain Boulevard, Vancouver

    Crash countermeasures at the intersection, addressing insufficient infrastructure for pedestrians and mobility users. Outside 6-year horizon.

    $500K

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    463 ft route · 4 crossings (2 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 136 ↗

  6. Southeast 29th Street - Southeast 176th Avenue to Southeast 192nd Avenue

    Southeast 29th Street, Southeast 176th Avenue to Southeast 192nd Avenue, Vancouver

    New 3-lane arterial with mobility lanes, sidewalks, ADA ramps and a shared use path on the south side, developer built for the Vancouver Innovation Center. Outside 6-year horizon.

    $10.0M · Developer, Developer contributions

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 117 ↗