Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
3
Planned
$22.4M
On agendas
0
  • Planning 3

3 of 205 projects · Trail: An off-street trail or shared-use path. · Clear filters

Vancouver3 projects · $22.4M

  1. Evergreen Highway Pathway - Columbia Springs to Southeast 164th Avenue

    Southeast Evergreen Highway, Southeast Silver Springs Drive to Southeast 164th Avenue, Vancouver

    Upgrade roadway with a 6 to 10 foot pedestrian pathway on a priority east-west walking and biking corridor. Outside 6-year horizon.

    $7.0M

    Sidewalks along the route today: 2%OS-CONNECT, Nov 2026 ↗

    1.7 mi route · 37 crossings (37 unmarked) · 3 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 76 ↗