Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
19
Planned
$38.8M
On agendas
0
  • Funded, phase unclear 19

19 of 205 projects · Trail: An off-street trail or shared-use path. · Clear filters

Vancouver6 projects · $20.6M

  1. Funded, phase unclear2026–2027TrailWalkingBiking

    Evergreen Trail - Chelsea to Image

    Southeast Evergreen Highway, Southeast Chelsea Avenue to Southeast Image Road, Vancouver

    Upgrade roadway with a 6 to 10 foot pedestrian pathway on the south side, a priority east-west walking and biking corridor.

    $4.0M · 63% secured · Grant, Local

    Sidewalks along the route today: 8%OS-CONNECT, Nov 2026 ↗

    1.1 mi route · 62 crossings (62 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  2. Funded, phase unclear2026–2027TrailWalkingBikingStreet safety

    Hazel Dell Avenue and Burnt Bridge Creek Trail Crossing Improvements

    Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail, Vancouver

    Adds a designated crossing of Hazel Dell Avenue connecting the city and county segments of the Burnt Bridge Creek Trail.

    $1.0M · 70% secured · Grant, Local

    Sidewalks along the route today: 100% · both sides 96%OS-CONNECT, Nov 2026 ↗

    0.2 mi route · 10 crossings (9 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  3. Northeast 112th Avenue/Southeast Chkalov Drive Complete Street Project - Northeast 2nd Street to Southeast 3rd Street

    Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver

    Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.

    $4.5M

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    115 ft route · 4 crossings (4 unmarked) · 2 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 174 ↗

  4. Funded, phase unclearWalkingBikingTrail

    Southeast Evergreen Highway Pathway - Southeast Image Road to Southeast 100th Court

    Southeast Evergreen Highway, Southeast Image Road to Southeast 100th Court, Vancouver

    Adds a 6 to 10 foot pedestrian pathway on the south side of SE Evergreen Highway, a priority east/west walking and biking corridor. Design and right-of-way funded; construction unfunded.

    $1.0M

    Sidewalks along the route today: 1%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 47 crossings (47 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 86 ↗

Ridgefield6 projects · $6.1M

  1. Funded, phase unclear2027TrailWalkingBikingStreet safety

    Carty Road Multi-Purpose Trail Phase 1

    Carty Road at Hillhurst Road, Ridgefield

    First phase of a multipurpose trail along Carty Road, including design, acquisition and construction of an enhanced crosswalk with RRFB at Hillhurst and Carty Road.

    $278K · 42% secured · Local, State Capital grant

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

  2. Funded, phase unclearTrailWalkingBiking

    Gee Creek Trail, Heron Dr to Main Ave

    Gee Creek Trail, Heron Drive to Main Avenue, Ridgefield

    Extends Gee Creek Trail north and west from Heron Drive to Main Avenue near the Ridgefield Wildlife Refuge Carty Unit, plus preliminary design of a multimodal BNSF rail crossing along Division Street to the waterfront.

    FLAP, TIF, Developer, State/Federal

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    502 ft route · 0 crossings · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

Camas3 projects · $505K

Clark County1 project · $286K

  1. Funded, phase unclear2027TrailWalkingBikingStreet safety

    NE Hazel Dell Ave and Burnt Bridge Creek Trail Crossing

    Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail

    Trail crossing of NE Hazel Dell Avenue for the Burnt Bridge Creek Trail near 5200-5400 NE Hazel Dell Ave.

    $286K · CRF

    Sidewalks along the route today: 100%OS-CONNECT, Nov 2026 ↗

    0.1 mi route · 3 crossings (3 unmarked) · 0 curb ramps

    Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗

Washougal1 project · $2.6M

La Center1 project · $8.6M

Other agencies1 project