Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
8
Planned
$161M
On agendas
0
  • Funded, phase unclear 8

8 of 205 projects · Transit: Bus service, stops, stations or bus rapid transit. · Clear filters

C-TRAN4 projects · $105M

  1. Funded, phase unclear2027–2030Transit

    ADA Expansion

    District Wide

    Enhanced mobility for seniors and people with disabilities through travel training, transportation services, vehicles and mobility management.

    $5.3M · 100% secured · 5310, Local

    RTC Clark County 2027-2030 TIP (adopted), p. 71 ↗

Vancouver3 projects · $5.8M

  1. Funded, phase unclear2026–2027WalkingStreet safetyTransit

    Northeast Fourth Plain Boulevard - Enhanced Pedestrian Crossings (SS4A)

    East Fourth Plain Boulevard at Neals Lane, Vancouver

    Pedestrian and ADA improvements on East Fourth Plain Boulevard, including a HAWK beacon and pedestrian refuges west of Reserve Street and at Neals Lane, improving safety and transit access.

    $770K · SS4A

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  2. Funded, phase unclear2026–2027Street rebuildWalkingBikingTransitStreet safety

    Upper Main Street Complete Street and Paving Project - East 39th to Northeast 45th Street/Hazel Dell

    Main Street, East 39th Street to Northeast 45th Street, Vancouver

    Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.

    $4.0M · 38% secured · Local, Grant

    Sidewalks along the route today: 100% · both sides 73%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 47 ↗

WSDOT1 project · $50.7M

  1. Funded, phase unclear2027TransitStudy

    I-5 Columbia River Bridge Replacement Transit Design

    I-5, Vancouver

    Post-NEPA design of light rail transit extension, track, systems and stations to apply for a federal Capital Investment Grant.

    $50.7M · 100% secured · Discretionary (Mega)

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗