Safe Routes to School Program
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.
The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.
74 of 205 projects · Walking: Adds or improves sidewalks, crossings or curb ramps. · Clear filters
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Southeast Evergreen Highway, Southeast Chelsea Avenue to Southeast Image Road, Vancouver
Upgrade roadway with a 6 to 10 foot pedestrian pathway on the south side, a priority east-west walking and biking corridor.
$4.0M · 63% secured · Grant, Local
1.1 mi route · 62 crossings (62 unmarked) · 0 curb ramps
East Fourth Plain Boulevard at Laurel Place, Vancouver
New pedestrian crossing at Fourth Plain Blvd and Laurel Place.
$500K · 80% secured · SS4A
Fourth Plain Boulevard at Watson Avenue, Vancouver
Install an enhanced pedestrian crossing at Fourth Plain and Watson Avenue.
$500K · 80% secured · SS4A
East Fourth Plain Boulevard, Vancouver
Install an enhanced pedestrian crossing on East Fourth Plain Boulevard to improve pedestrian safety and accessibility.
$500K · 80% secured · SS4A
2.8 mi route · 118 crossings (54 unmarked) · 13 curb ramps
Fourth Plain Boulevard, Vancouver
Traffic calming, lighting and pedestrian infrastructure on neighborhood streets in central Vancouver.
$4.3M · 94% secured · ARPA
Garrison Road, Mill Plain Boulevard to Northeast 12th Street, Vancouver
Install sidewalks and ADA ramps along Garrison Road from Mill Plain to David Douglas Park/NE 12th Street.
$1.6M · 63% secured · Grant
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail, Vancouver
Adds a designated crossing of Hazel Dell Avenue connecting the city and county segments of the Burnt Bridge Creek Trail.
$1.0M · 70% secured · Grant, Local
0.2 mi route · 10 crossings (9 unmarked) · 1 curb ramp
West 39th Street at Daniels Street, Vancouver
High-visibility crosswalk, stop lines, RRFB, ADA curb ramps and accessible pedestrian signals near Lincoln Elementary School.
$300K · 100% secured · SRTS, Grant
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 192 ↗
Southeast McGillivray Boulevard, Southeast Chkalov Drive to Southeast 164th Avenue, Vancouver
Complete street safety improvements for walking, biking and mobility devices on McGillivray Boulevard, done with the planned repaving.
$7.5M · Local
2.6 mi route · 75 crossings (43 unmarked) · 7 curb ramps
Neals Lane, East 24th Street to East 28th Street, Vancouver
Extend the sidewalk along Neals Lane.
$635K · 84% secured · SS4A
0.2 mi route · 7 crossings (7 unmarked) · 1 curb ramp
Northeast 18th Street at Northeast Devine Road, Vancouver
ADA access improvements at NE 18th Street and Devine Road, funded through the Multimodal Safety and Accessibility program; part of the Safe Streets for All package.
$550K · 100% secured · SS4A, Local, TRANS-844 Multimodal Safety and Accessibility
0.1 mi route · 6 crossings (6 unmarked) · 0 curb ramps
East Fourth Plain Boulevard at Neals Lane, Vancouver
Pedestrian and ADA improvements on East Fourth Plain Boulevard, including a HAWK beacon and pedestrian refuges west of Reserve Street and at Neals Lane, improving safety and transit access.
$770K · SS4A
Rossiter Lane at Burnt Bridge Creek Trail, Vancouver
New pedestrian bridge creating a connection to the Burnt Bridge Creek Trail.
$1.6M · 61% secured · SS4A
Stapleton Road, SR 500 to Northeast 18th Street, Vancouver
Restripes Stapleton Road to remove the center turn lane and add buffered bike/mobility lanes in both directions.
$1.0M · 80% secured · SS4A
Todd Road, Fourth Plain Boulevard to East 18th Street, Vancouver
Fills sidewalk gaps on Todd Road.
$635K · 84% secured · SS4A
Main Street, East 39th Street to Northeast 45th Street, Vancouver
Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.
$4.0M · 38% secured · Local, Grant
0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp
Z Street, East Fourth Plain Boulevard to Northeast 26th Street, Vancouver
Fills sidewalk gaps on Z Street.
$448K · 78% secured · SS4A
East 34th Street, Fourth Plain Boulevard to Northeast 34th Street, Vancouver
New north-south pedestrian connection between Fourth Plain and NE 34th Street, between NE 57th and 62nd Avenues; exact location TBD.
$435K · 77% secured · SS4A
282 ft route · 8 crossings (8 unmarked) · 2 curb ramps
Citywide, Vancouver
New citywide program retrofitting curb ramps to current standards, budgeted at $2.5M per year.
$15.0M · Local
Heights District Grand Loop, Vancouver
Complete street enhancements on two segments of the Grand Loop, a pedestrian-focused street and linear park in the Heights District.
$21.8M · 100% secured · RAISE, Local
Northeast 52nd Street at Northeast 135th Avenue, Vancouver
High-visibility crosswalk, RRFB, signage, crossing and segment lighting, and curb extension at Image Elementary School.
$292K · 100% secured · Safe Routes to School, SRTS
Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing citywide program budgeted at $1.5 million per year to fix safety and accessibility problems for people walking, biking and rolling.
$9.0M · Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 18th Street, Vancouver
RRFBs, refuge islands, speed feedback signs, bike lanes, sidewalk and lighting on NE 112th Avenue.
$1.8M · 100% secured · WSDOT
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing traffic calming program with education or infrastructure to reduce driver speeds and new or improved facilities for people walking, biking and using mobility devices. Annual budget $300,000.
$1.8M · Dedicated Street Funding, Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 28th Street, Vancouver
Repave and rechannelize to one general purpose lane plus a center turn lane, adding buffered/protected mobility lanes between Mill Plain and 18th Street.
$3.5M · 100% secured · Grant, Local
Northeast 72nd Avenue, Northeast 40th Street to Northeast 78th Street, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.5M · Local
1.9 mi route · 81 crossings (66 unmarked) · 15 curb ramps
Northeast 87th Avenue, Fourth Plain Boulevard to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$2.1M · Local
154 ft route · 4 crossings (4 unmarked) · 0 curb ramps
Northeast 97th Avenue, Northeast Burton Road to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.7M · Local
0.4 mi route · 7 crossings (7 unmarked) · 0 curb ramps
Citywide, Vancouver
Citywide program, $500,000 per year, managing sidewalks and ADA curb ramps and helping owners fix frontage deficiencies.
$3.0M · Local
Northeast 72nd Avenue, Northeast 54th Street to Northeast 60th Street, Vancouver
High-visibility crosswalks, lighting, ADA ramps, accessible signals, buffered sidewalk and speed cushions along NE 72nd Avenue at Walnut Grove Elementary.
$2.0M · 100% secured · SRTS, Safe Routes to School
0.3 mi route · 18 crossings (14 unmarked) · 4 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 113 ↗Vancouver 2027-2032 TIP (adopted), p. 46 ↗
Northeast 112th Avenue, Northeast 28th Street to Northeast 51st Street, Vancouver
Repave and restripe NE 112th Avenue to add bike and small mobility lanes, a neighborhood greenway alternate route with traffic calming and wayfinding, shared lane markings, and a long-term two-way shared use path on the east side.
$4.0M · Local
Southeast Chkalov Drive, Southeast 3rd Street to Southeast McGillivray Boulevard, Vancouver
Road reconfiguration with protected bike and small mobility lanes, enhanced pedestrian crossing, signal modification and ADA ramps.
$1.3M
0.3 mi route · 11 crossings (2 unmarked) · 1 curb ramp
Northeast 9th Street, Fircrest Elementary to Northeast 128th Avenue, Vancouver
Adds lighting at marked crosswalks on NE 9th Street near Fircrest Elementary and at 123rd, 125th, 127th and 128th Avenues; developer funded.
$225K · Developer
East 29th Street, I-5 to Neals Lane, Vancouver
Lower speed limit, add speed cushions, shared lane markings, traffic circles, an improved Grand Boulevard crossing with pedestrian island and bike crossing, fill sidewalk gaps and add wayfinding.
$700K
1.3 mi route · 79 crossings (72 unmarked) · 6 curb ramps
East 33rd Street, I-5 to Grand Boulevard, Vancouver
Repave and restripe East 33rd Street with lower speed limits, buffered mobility lanes, an RRFB with raised crossing at F Street, speed humps, shared lane markings and intersection improvements at Grand.
$2.0M
1.0 mi route · 71 crossings (50 unmarked) · 18 curb ramps
Northwest Fruit Valley Road at Firestone Lane, Vancouver
Enhanced pedestrian crossing. Outside 6-year horizon.
$1.0M
0.2 mi route · 2 crossings (2 unmarked) · 0 curb ramps
MacArthur Boulevard at South Blandford Drive, Vancouver
Enhanced pedestrian crossing. Outside 6-year horizon.
$1.0M
180 ft route · 3 crossings (3 unmarked) · 1 curb ramp
Northeast 112th Avenue, Northeast 18th Street to Northeast 51st Street, Vancouver
Off-street multimodal path along the east side of NE 112th Avenue.
$8.5M
Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver
Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.
$4.5M
115 ft route · 4 crossings (4 unmarked) · 2 curb ramps
East Fourth Plain Boulevard at Grand Boulevard, Vancouver
Rebuilds the southwest corner for pedestrian safety, ADA access and sight distance at crossings. Outside 6-year horizon.
$700K
Southeast 10th Street, Southeast 98th Avenue to Southeast Ellsworth Road, Vancouver
Installs sidewalks and ADA ramps on SE 10th Street where none exist, completing an east/west active transportation corridor. Outside 6-year horizon.
$2.0M
0.5 mi route · 37 crossings (31 unmarked) · 2 curb ramps
Southeast Evergreen Highway, Southeast Image Road to Southeast 100th Court, Vancouver
Adds a 6 to 10 foot pedestrian pathway on the south side of SE Evergreen Highway, a priority east/west walking and biking corridor. Design and right-of-way funded; construction unfunded.
$1.0M
0.4 mi route · 47 crossings (47 unmarked) · 1 curb ramp
Main Street, Fourth Plain Boulevard to East 37th Street, Vancouver
Removes a northbound lane, adds marked crossings with median islands at 31st and 35th Streets, wayfinding and a 25 mph limit, coordinated with C-TRAN Highway 99 BRT.
$1.0M
West 11th Street, Vancouver
Multimodal grade-separated crossing of the railroad at West 11th Street to improve safety.
$2.5M
0.7 mi route · 40 crossings (19 unmarked) · 5 curb ramps
Downtown Vancouver westside, Vancouver
Further phases of traffic calming, mobility lanes and pedestrian improvements across west downtown Vancouver after the Columbia corridor phase. Outside 6-year horizon.
$5.0M
Highway 99, Northeast 102nd Street to Northeast 104th Street
Sidewalk along Highway 99 near NE 102nd to NE 104th Street, finishing construction.
$2.1M · TIF, Grants/Loans
0.1 mi route · 7 crossings (5 unmarked) · 1 curb ramp
Northeast 68th Street, Highway 99 to Northeast Saint Johns Road
Sidewalk on NE 68th Street from Highway 99 to NE St. Johns Road, wrapping up construction.
$8.4M · CRF, TIF, Grants/Loans
1.3 mi route · 42 crossings (40 unmarked) · 3 curb ramps
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail
Trail crossing of NE Hazel Dell Avenue for the Burnt Bridge Creek Trail near 5200-5400 NE Hazel Dell Ave.
$286K · CRF
0.1 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗
Various locations
Annual ADA curb ramp and accessibility improvements tied to paving, 2026-2035 batches.
CRF, Grants/Loans
Southeast Crown Road, Southeast 23rd Street to West Fir Court
Separated pedestrian and bicycle facilities, ADA ramps, RRFBs and school crossing upgrades.
$5.2M · 97% secured · TA(UL), CMAQ, Local
Show on the mapClark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Various locations
Countywide program building sidewalks and ADA accessibility improvements.
$58.7M · CRF, TIF, Grants/Loans, Other
Clark County 2026 Annual Construction Program (adopted), p. 3 ↗Clark County 2026-2031 TIP (adopted), p. 2 ↗Clark County 2027-2032 TIP (draft), p. 3 ↗
Northeast 44th Street, Northeast 47th Avenue to Northeast 40th Avenue
School zone sidewalks, ADA ramps, RRFBs with lighting and school crossing upgrades near Truman School.
$2.0M · 71% secured · SRTS, TIB, Local
0.3 mi route · 15 crossings (12 unmarked) · 3 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Highway 99, Northeast 110th Street to Northeast 117th Street
New curb and sidewalk on the east side of Highway 99 filling the gap from NE 110th Street to near NE 117th Street, plus stormwater and signal upgrades.
$4.0M · 65% secured · TA(UL), Local
0.3 mi route · 16 crossings (10 unmarked) · 2 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest 139th Street, Northwest 10th Avenue to Northwest 26th Avenue
School zone sidewalks, ADA ramps, RRFBs with lighting, school crossing upgrades and flashers.
$1.6M · 78% secured · TA(UL), Local
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Carty Road at Hillhurst Road, Ridgefield
First phase of a multipurpose trail along Carty Road, including design, acquisition and construction of an enhanced crosswalk with RRFB at Hillhurst and Carty Road.
$278K · 42% secured · Local, State Capital grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Gee Creek Trail at Heron Drive, Ridgefield
Looped trail from Heron Drive at the Heron Ridge stormwater facility.
$1.4M · 60% secured · WFL, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 100 ↗
South Hillhurst Road at South Sevier Road, Ridgefield
New multimodal trail on the north side of S Hillhurst Road from S Sevier Road to Ridgefield High School.
$446K · 100% secured · TA(US), Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Ridgefield
Annual sidewalk repairs and improvements guided by the ADA Transition and Mobility/Access Plan.
Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Carty Road at Hillhurst Road, Ridgefield
Multipurpose trail along Carty Road from Hillhurst Road east for about half a mile.
Developer, Bike/Ped/Trail grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Gee Creek Trail, Abrams Park to Royle Road, Ridgefield
Extends the Gee Creek regional multi-use trail from Abrams Park to Royle Road, with slope stabilization.
$4.0M · State RCO, State/Federal Bike/Pedestrian, REET, Local
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Gee Creek Trail, Heron Drive to Main Avenue, Ridgefield
Extends Gee Creek Trail north and west from Heron Drive to Main Avenue near the Ridgefield Wildlife Refuge Carty Unit, plus preliminary design of a multimodal BNSF rail crossing along Division Street to the waterfront.
FLAP, TIF, Developer, State/Federal
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Camas
Ongoing citywide ADA accessibility upgrades.
$720K · Local
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
Camas
Citywide sidewalk installations including curb ramps.
$300K · Local
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 7 ↗
Camas
Citywide shared path improvements including NW Norwood Dr.
$250K
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 8 ↗
Northwest 18th Avenue, Northwest Tidland Street to Northwest Brady Road, Camas
Sidewalk / path from NW Tidland St to NW Brady Rd.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northwest Lake Road at Northwest Leadbetter Drive, Camas
Install pedestrian facilities (sidewalk) along NW Lake Road.
$783K · 26% secured · TA(UL), Local
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest Leadbetter Drive, Northwest Lake Road to Northwest Fremont Street, Camas
Sidewalk / path construction.
$250K
0.3 mi route · 10 crossings (6 unmarked) · 1 curb ramp
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
39th Street, Evergreen Way to J Street, Washougal
Safe routes to school project with lane narrowing, sidewalks, buffered bike lanes, high-visibility crosswalks with rapid flashing beacons, ADA ramps, speed humps and safety education.
$2.6M · 85% secured · SRTS, Local
0.5 mi route · 21 crossings (15 unmarked) · 1 curb ramp
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
Washougal
Signing, markings, curb bulb-outs, traffic circles and sight distance improvements at various intersections, shortening crossings and calming traffic.
$522K · 77% secured · HSIP
South 27th Street, Main Street to Index Street, Washougal
New separated shared use path along the east side of 27th Street between Main Street and Index Street.
$2.6M · 81% secured · TA(UL), Local
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
Fairgrounds Road, Fairgrounds Entrance to Byers Street
Construct sidewalks, ADA curb ramps, curb and gutter, signing, markings and streetscape from the fairgrounds entrance to Byers Street.
$1.0M · 93% secured · TA(R), Local
Lead agency: Klickitat County
Show on the mapRTC Klickitat and Skamania County 2027-2030 TIP (adopted), p. 18 ↗
Alder Street, Steuben Street to Franklin Street, Bingen
Infill sidewalk gaps along both Alder Street and Cedar Street between Steuben and Franklin.
$935K · 89% secured · TA(US), TIB, Local
Lead agency: City of Bingen
RTC Klickitat and Skamania County 2027-2030 TIP (adopted), p. 18 ↗
La Center Road at Paradise Park Road, La Center
10-foot-wide shared use path along La Center Road to the Lewis River bridge.
$8.6M · 9% secured · TA(R), Local
1.0 mi route · 15 crossings (15 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗