Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
20
Planned
$50.1M
On agendas
0
  • Planning 20

20 of 205 projects · Clear filters

Vancouver19 projects · $50.1M

  1. East 18th Street Mobility Lane Improvements and Traffic Calming - Grand Boulevard to Northeast Burton Road

    East 18th Street, Grand Boulevard to Northeast Burton Road, Vancouver

    Add buffers and vertical elements to bike/mobility lanes on East 18th Street, possibly narrowing travel lanes and lowering speeds. Outside 6-year horizon.

    $2.0M

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    443 ft route · 3 crossings (2 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 139 ↗

  2. Evergreen Highway Pathway - Columbia Springs to Southeast 164th Avenue

    Southeast Evergreen Highway, Southeast Silver Springs Drive to Southeast 164th Avenue, Vancouver

    Upgrade roadway with a 6 to 10 foot pedestrian pathway on a priority east-west walking and biking corridor. Outside 6-year horizon.

    $7.0M

    Sidewalks along the route today: 2%OS-CONNECT, Nov 2026 ↗

    1.7 mi route · 37 crossings (37 unmarked) · 3 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 76 ↗

  3. Fourth Plain Boulevard Safety and Mobility - 121st Avenue to 127th Avenue

    Fourth Plain Boulevard, Northeast 121st Avenue to Northeast 127th Avenue, Vancouver

    Safety improvements on a high-crash segment of Fourth Plain served by bus rapid transit, possibly including road reconfiguration, signal phasing changes, lighting and reduced crash exposure for vulnerable users. Outside 6-year horizon.

    $1.0M

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 135 ↗

  4. Southeast 164th Avenue Safety/Mobility Improvements - Tech Center Drive to Southeast 1st Street

    Southeast 164th Avenue, Southeast Tech Center Drive to Southeast 1st Street, Vancouver

    Safety treatments at a top crash location such as refuge islands, raised crossings, signal and marking changes. Outside 6-year horizon.

    $2.0M

    Sidewalks along the route today: 100% · both sides 97%OS-CONNECT, Nov 2026 ↗

    0.6 mi route · 27 crossings (6 unmarked) · 7 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 127 ↗

Ridgefield1 project