Safe Routes to School Program
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.
The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.
Not counted: I-5 Columbia River Bridge Replacement ($5.0B), which alone would be 81% of the total.
165 of 205 projects · Clear filters
Vancouver
Citywide program working with schools to analyze walking routes, gaps and safety issues to develop safe route projects; $200,000 per year.
$1.2M · Local
Southeast Evergreen Highway, Southeast Chelsea Avenue to Southeast Image Road, Vancouver
Upgrade roadway with a 6 to 10 foot pedestrian pathway on the south side, a priority east-west walking and biking corridor.
$4.0M · 63% secured · Grant, Local
1.1 mi route · 62 crossings (62 unmarked) · 0 curb ramps
East Fourth Plain Boulevard at Laurel Place, Vancouver
New pedestrian crossing at Fourth Plain Blvd and Laurel Place.
$500K · 80% secured · SS4A
Fourth Plain Boulevard at Watson Avenue, Vancouver
Install an enhanced pedestrian crossing at Fourth Plain and Watson Avenue.
$500K · 80% secured · SS4A
East Fourth Plain Boulevard, Vancouver
Install an enhanced pedestrian crossing on East Fourth Plain Boulevard to improve pedestrian safety and accessibility.
$500K · 80% secured · SS4A
2.8 mi route · 118 crossings (54 unmarked) · 13 curb ramps
Fourth Plain Boulevard, Vancouver
Traffic calming, lighting and pedestrian infrastructure on neighborhood streets in central Vancouver.
$4.3M · 94% secured · ARPA
Garrison Road, Mill Plain Boulevard to Northeast 12th Street, Vancouver
Install sidewalks and ADA ramps along Garrison Road from Mill Plain to David Douglas Park/NE 12th Street.
$1.6M · 63% secured · Grant
Heights District, Vancouver
Network of street, pedestrian and mobility improvements forming a loop around the Tower Mall redevelopment area, connecting MacArthur Boulevard, Devine Road and Mill Plain Boulevard.
$20.0M
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail, Vancouver
Adds a designated crossing of Hazel Dell Avenue connecting the city and county segments of the Burnt Bridge Creek Trail.
$1.0M · 70% secured · Grant, Local
0.2 mi route · 10 crossings (9 unmarked) · 1 curb ramp
West 39th Street at Daniels Street, Vancouver
High-visibility crosswalk, stop lines, RRFB, ADA curb ramps and accessible pedestrian signals near Lincoln Elementary School.
$300K · 100% secured · SRTS, Grant
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 192 ↗
MacArthur Boulevard, Blandford Drive to Lieser Road, Vancouver
Moves vehicle travel to the east side of the median and converts the west side to separated mobility lanes, pedestrian facilities and a greenbelt, with improved crossings at Blandford, Phoenix, Texas and Burdick.
$15.0M · 27% secured · Grant
180 ft route · 3 crossings (3 unmarked) · 1 curb ramp
Southeast McGillivray Boulevard, Southeast Chkalov Drive to Southeast 164th Avenue, Vancouver
Complete street safety improvements for walking, biking and mobility devices on McGillivray Boulevard, done with the planned repaving.
$7.5M · Local
2.6 mi route · 75 crossings (43 unmarked) · 7 curb ramps
Neals Lane, East 24th Street to East 28th Street, Vancouver
Extend the sidewalk along Neals Lane.
$635K · 84% secured · SS4A
0.2 mi route · 7 crossings (7 unmarked) · 1 curb ramp
Northeast 18th Street, Northeast 97th Avenue to Northeast 107th Avenue, Vancouver
New and upgraded multimodal arterial with mobility lanes, sidewalk, ADA ramps and a multi-use path, with roundabouts being evaluated at intersections. Design and right-of-way work is continuing.
$25.0M · 40% secured · Local, Grant
0.2 mi route · 9 crossings (7 unmarked) · 1 curb ramp
Northeast 18th Street at Northeast Devine Road, Vancouver
ADA access improvements at NE 18th Street and Devine Road, funded through the Multimodal Safety and Accessibility program; part of the Safe Streets for All package.
$550K · 100% secured · SS4A, Local, TRANS-844 Multimodal Safety and Accessibility
0.1 mi route · 6 crossings (6 unmarked) · 0 curb ramps
East Fourth Plain Boulevard at Neals Lane, Vancouver
Pedestrian and ADA improvements on East Fourth Plain Boulevard, including a HAWK beacon and pedestrian refuges west of Reserve Street and at Neals Lane, improving safety and transit access.
$770K · SS4A
Rossiter Lane at Burnt Bridge Creek Trail, Vancouver
New pedestrian bridge creating a connection to the Burnt Bridge Creek Trail.
$1.6M · 61% secured · SS4A
Stapleton Road, SR 500 to Northeast 18th Street, Vancouver
Restripes Stapleton Road to remove the center turn lane and add buffered bike/mobility lanes in both directions.
$1.0M · 80% secured · SS4A
Todd Road, Fourth Plain Boulevard to East 18th Street, Vancouver
Fills sidewalk gaps on Todd Road.
$635K · 84% secured · SS4A
Main Street, East 39th Street to Northeast 45th Street, Vancouver
Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.
$4.0M · 38% secured · Local, Grant
0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp
Z Street, East Fourth Plain Boulevard to Northeast 26th Street, Vancouver
Fills sidewalk gaps on Z Street.
$448K · 78% secured · SS4A
East 34th Street, Fourth Plain Boulevard to Northeast 34th Street, Vancouver
New north-south pedestrian connection between Fourth Plain and NE 34th Street, between NE 57th and 62nd Avenues; exact location TBD.
$435K · 77% secured · SS4A
282 ft route · 8 crossings (8 unmarked) · 2 curb ramps
Northwest 78th Street at Northwest Lakeshore Avenue, Vancouver
Intersection improvements for freight and all modes, including bicycle and pedestrian enhancements.
$1.8M · 17% secured · Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 106 ↗
Citywide, Vancouver
New citywide program retrofitting curb ramps to current standards, budgeted at $2.5M per year.
$15.0M · Local
Heights District Grand Loop, Vancouver
Complete street enhancements on two segments of the Grand Loop, a pedestrian-focused street and linear park in the Heights District.
$21.8M · 100% secured · RAISE, Local
Northeast 52nd Street at Northeast 135th Avenue, Vancouver
High-visibility crosswalk, RRFB, signage, crossing and segment lighting, and curb extension at Image Elementary School.
$292K · 100% secured · Safe Routes to School, SRTS
Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing citywide program budgeted at $1.5 million per year to fix safety and accessibility problems for people walking, biking and rolling.
$9.0M · Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 18th Street, Vancouver
RRFBs, refuge islands, speed feedback signs, bike lanes, sidewalk and lighting on NE 112th Avenue.
$1.8M · 100% secured · WSDOT
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Citywide, Vancouver
Ongoing traffic calming program with education or infrastructure to reduce driver speeds and new or improved facilities for people walking, biking and using mobility devices. Annual budget $300,000.
$1.8M · Dedicated Street Funding, Local
Northeast 112th Avenue, Mill Plain Boulevard to Northeast 28th Street, Vancouver
Repave and rechannelize to one general purpose lane plus a center turn lane, adding buffered/protected mobility lanes between Mill Plain and 18th Street.
$3.5M · 100% secured · Grant, Local
Northeast 18th Street, Northeast 141st Avenue to Northeast 162nd Avenue, Vancouver
Upgrade to a 5-lane principal arterial with separated and protected mobility lanes, sidewalk, ADA ramps and a south-side shared use path. Construction is set to start in 2027.
$18.4M · 41% secured · Grant
1.0 mi route · 46 crossings (33 unmarked) · 9 curb ramps
Northeast 192nd Avenue, Northeast 18th Street to Southeast 1st Street, Vancouver
Urban upgrade of a 2-lane street with added lanes, sidewalks, mobility lanes and ADA ramps. A federal grant funds design and an RTC grant funds right-of-way.
$21.2M · 34% secured · STBG(UL), Local, Federal grant, RTC, RTC grant
1.0 mi route · 31 crossings (26 unmarked) · 3 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 105 ↗Vancouver 2027-2032 TIP (adopted), p. 66 ↗
Northeast 28th Street, Northeast 138th Avenue to Northeast 162nd Avenue, Vancouver
Upgrade rural 2-lane road to urban 3-lane minor arterial with sidewalks, mobility lanes, streetlights, signals and school crossings.
$14.5M · 40% secured · STBG(UL), Local, Grant
1.2 mi route · 66 crossings (52 unmarked) · 11 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 59 ↗
Northeast 72nd Avenue, Northeast 40th Street to Northeast 78th Street, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.5M · Local
1.9 mi route · 81 crossings (66 unmarked) · 15 curb ramps
Northeast 87th Avenue, Fourth Plain Boulevard to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$2.1M · Local
154 ft route · 4 crossings (4 unmarked) · 0 curb ramps
Northeast 97th Avenue, Northeast Burton Road to Mill Plain Boulevard, Vancouver
Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.
$1.7M · Local
0.4 mi route · 7 crossings (7 unmarked) · 0 curb ramps
Citywide, Vancouver
Citywide program, $500,000 per year, managing sidewalks and ADA curb ramps and helping owners fix frontage deficiencies.
$3.0M · Local
Northeast 72nd Avenue, Northeast 54th Street to Northeast 60th Street, Vancouver
High-visibility crosswalks, lighting, ADA ramps, accessible signals, buffered sidewalk and speed cushions along NE 72nd Avenue at Walnut Grove Elementary.
$2.0M · 100% secured · SRTS, Safe Routes to School
0.3 mi route · 18 crossings (14 unmarked) · 4 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 113 ↗Vancouver 2027-2032 TIP (adopted), p. 46 ↗
Northeast 112th Avenue, Northeast 28th Street to Northeast 51st Street, Vancouver
Repave and restripe NE 112th Avenue to add bike and small mobility lanes, a neighborhood greenway alternate route with traffic calming and wayfinding, shared lane markings, and a long-term two-way shared use path on the east side.
$4.0M · Local
Northeast 49th Street, Northeast 122nd Avenue to Northeast 137th Avenue, Vancouver
Upgrade 2-lane street to 3-lane urban minor arterial with sidewalks, ADA ramps, mobility lanes and streetlights.
$14.3M · 13% secured · STBG(UL), Local, Grant
0.8 mi route · 31 crossings (23 unmarked) · 7 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 60 ↗
Southeast Chkalov Drive, Southeast 3rd Street to Southeast McGillivray Boulevard, Vancouver
Road reconfiguration with protected bike and small mobility lanes, enhanced pedestrian crossing, signal modification and ADA ramps.
$1.3M
0.3 mi route · 11 crossings (2 unmarked) · 1 curb ramp
Northeast 9th Street, Fircrest Elementary to Northeast 128th Avenue, Vancouver
Adds lighting at marked crosswalks on NE 9th Street near Fircrest Elementary and at 123rd, 125th, 127th and 128th Avenues; developer funded.
$225K · Developer
North Andresen Road, East Mill Plain Boulevard to Highland Drive, Vancouver
Road diet from four to two lanes, protected mobility lanes, wider sidewalks, planter strips and crossings at Wichita, Missouri and Louisiana. Outside 6-year horizon.
$10.0M
East 29th Street, I-5 to Neals Lane, Vancouver
Lower speed limit, add speed cushions, shared lane markings, traffic circles, an improved Grand Boulevard crossing with pedestrian island and bike crossing, fill sidewalk gaps and add wayfinding.
$700K
1.3 mi route · 79 crossings (72 unmarked) · 6 curb ramps
East 33rd Street, I-5 to Grand Boulevard, Vancouver
Repave and restripe East 33rd Street with lower speed limits, buffered mobility lanes, an RRFB with raised crossing at F Street, speed humps, shared lane markings and intersection improvements at Grand.
$2.0M
1.0 mi route · 71 crossings (50 unmarked) · 18 curb ramps
East Mill Plain Boulevard, Boise Avenue to North Andresen Road, Vancouver
Narrower lanes, protected mobility lanes, better sidewalks, planter strips and crossings at Ogden, Missoula and Helena, accommodating future BRT.
$10.0M
1.0 mi route · 18 crossings (2 unmarked) · 10 curb ramps
Northwest Fruit Valley Road at Firestone Lane, Vancouver
Enhanced pedestrian crossing. Outside 6-year horizon.
$1.0M
0.2 mi route · 2 crossings (2 unmarked) · 0 curb ramps
Southeast MacArthur Boulevard at Southeast Leiser Road, Vancouver
Replaces a 4-way stop with a signal or roundabout and adds upgraded sidewalks, ADA ramps and streetlights.
$4.7M
MacArthur Boulevard at South Blandford Drive, Vancouver
Enhanced pedestrian crossing. Outside 6-year horizon.
$1.0M
180 ft route · 3 crossings (3 unmarked) · 1 curb ramp
MacArthur Boulevard at North Andresen Road, Vancouver
Roundabout to improve multimodal safety. Outside 6-year horizon.
$2.0M
MacArthur Boulevard at North Devine Road, Vancouver
Roundabout to improve multimodal safety. Outside 6-year horizon.
$2.0M
Southeast McGillivray Boulevard at Village Loop Drive, Vancouver
New roundabout or signal, addressing safety for active transportation users.
$500K
315 ft route · 4 crossings · 1 curb ramp
Vancouver
Replaces an all-way stop with a roundabout or signal, including safety improvements for active transportation users, per the McGillivray Boulevard Safety and Mobility Project.
$500K
Mill Plain Boulevard, Blandford Drive to Devine Road, Vancouver
Heights District Plan roadway changes on Devine Road and Mill Plain Boulevard to improve safety and support multimodal mobility.
$6.3M
North Devine Road, East Mill Plain Boulevard to MacArthur Boulevard, Vancouver
Two-way protected mobility lane on the west side, improved sidewalks and ADA access, planter strips and enhanced crossings. Outside 6-year horizon.
$4.0M
0.3 mi route · 8 crossings · 4 curb ramps
Northeast 112th Avenue, Northeast 18th Street to Northeast 51st Street, Vancouver
Off-street multimodal path along the east side of NE 112th Avenue.
$8.5M
Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver
Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.
$4.5M
115 ft route · 4 crossings (4 unmarked) · 2 curb ramps
East Fourth Plain Boulevard at Grand Boulevard, Vancouver
Rebuilds the southwest corner for pedestrian safety, ADA access and sight distance at crossings. Outside 6-year horizon.
$700K
Northwest Lakeshore Avenue, Burnt Bridge Creek to Northwest 78th Street, Vancouver
Rebuilds Lakeshore/Fruit Valley with mobility lanes, sidewalks and a 10-foot west-side multi-use path. Outside 6-year horizon.
$10.0M
Northwest 32nd Avenue, SR 501 to Northwest 61st Street, Vancouver
New road segment with mobility lanes, planter strips and sidewalks, including a 10-foot west-side multi-use path. Outside 6-year horizon.
$64.0M
Northwest Lakeshore Avenue, Northwest 61st Street to Burnt Bridge Creek, Vancouver
Rebuilds Lakeshore/Fruit Valley and the BNSF bridge with mobility lanes, sidewalks and a 10-foot west-side multi-use path. Outside 6-year horizon.
$49.0M
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Saint Johns Boulevard at Fort Vancouver Way, Vancouver
Enhanced stop control and roadway improvements to improve safety for all modes, from the Saint Johns/Saint James Safety and Mobility Project. Outside 6-year horizon.
$2.0M
Southeast 10th Street, Southeast 98th Avenue to Southeast Ellsworth Road, Vancouver
Installs sidewalks and ADA ramps on SE 10th Street where none exist, completing an east/west active transportation corridor. Outside 6-year horizon.
$2.0M
0.5 mi route · 37 crossings (31 unmarked) · 2 curb ramps
Southeast Evergreen Highway, Southeast Image Road to Southeast 100th Court, Vancouver
Adds a 6 to 10 foot pedestrian pathway on the south side of SE Evergreen Highway, a priority east/west walking and biking corridor. Design and right-of-way funded; construction unfunded.
$1.0M
0.4 mi route · 47 crossings (47 unmarked) · 1 curb ramp
Southeast McGillivray Boulevard at Southeast 166th Avenue, Vancouver
Urban roundabout with upgraded ADA ramps and streetlights. Outside 6-year horizon.
$500K
Main Street, Fourth Plain Boulevard to East 37th Street, Vancouver
Removes a northbound lane, adds marked crossings with median islands at 31st and 35th Streets, wayfinding and a 25 mph limit, coordinated with C-TRAN Highway 99 BRT.
$1.0M
West 11th Street, Vancouver
Multimodal grade-separated crossing of the railroad at West 11th Street to improve safety.
$2.5M
0.7 mi route · 40 crossings (19 unmarked) · 5 curb ramps
Downtown Vancouver westside, Vancouver
Further phases of traffic calming, mobility lanes and pedestrian improvements across west downtown Vancouver after the Columbia corridor phase. Outside 6-year horizon.
$5.0M
Camas
Ongoing citywide ADA accessibility upgrades.
$720K · Local
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
Northeast 3rd Avenue, Northeast Garfield Street to Northeast Lechner Street, Camas
Road diet with buffered bike lanes, some with vertical delineation, speed feedback signs, signal modifications and ADA accessibility.
$3.3M · 100% secured · HSIP, Local
1.7 mi route · 56 crossings (38 unmarked) · 11 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest Lake Road, Camas
Future safety projects including traffic revisions and NW Lake Rd safety improvements.
$930K · HSIP
2.9 mi route · 35 crossings (24 unmarked) · 3 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 8 ↗
Camas
Citywide sidewalk installations including curb ramps.
$300K · Local
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 7 ↗
North Shore Boulevard, North Benton Drive to SR 500, Camas
New road construction including complete streets and a bridge.
$25.0M · Local
0.2 mi route · 6 crossings (5 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗
North Shore Boulevard at North Benton Drive, Camas
New road construction including complete streets and roundabouts.
$22.7M · Local
0.2 mi route · 6 crossings (5 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗
Camas
Citywide shared path improvements including NW Norwood Dr.
$250K
Camas 2027-2032 Six Year Street Plan (TIP) Project List, p. 8 ↗
SR 500, Northeast 35th Avenue to Northeast 43rd Avenue, Camas
Improve SR-500/Everett Street to urban arterial standards with pedestrian and bicycle facilities, lighting and stormwater.
$15.5M · 9% secured · STBG(UL), Local
0.4 mi route · 16 crossings (13 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest 18th Avenue, Northwest Tidland Street to Northwest Brady Road, Camas
Sidewalk / path from NW Tidland St to NW Brady Rd.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northwest 18th Avenue, Northwest Astor Street to Northwest 16th Avenue, Camas
Widen curb and add sidewalk, including NW Hood.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northwest 6th Avenue, Northwest Norwood Street to Northeast Adams Street, Camas
Access and multimodal upgrades on 6th Avenue.
$250K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
SR 500, Northeast Lake Road to Northeast 35th Avenue, Camas
Widen SR-500 with multimodal facilities, illumination, bridge replacement and a roundabout.
$26.4M · Local
0.3 mi route · 9 crossings (3 unmarked) · 3 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗
Crown Road, Southeast 23rd Street to Northeast 3rd Avenue, Camas
Multimodal, turn lane and intersection improvements.
$13.0M
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
Downtown Camas, Camas
Pavement and sidewalk rehabilitation with ADA upgrades downtown.
$1.7M
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Northeast Goodwin Road, Northwest Camas Meadows Drive to Northeast 232nd Avenue, Camas
Widen to 5 and 3 lanes with bike lanes and sidewalk.
$29.3M
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
Northwest 18th Avenue at Northwest 20th Avenue, Camas
Widening with bike lanes.
$5K
0.4 mi route · 15 crossings (14 unmarked) · 3 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 5 ↗
Northwest 20th Avenue, Northwest Sage Street to Northwest 18th Avenue, Camas
New construction with multimodal facilities.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northwest 23rd Avenue, Northwest Astor Street to Northwest Sierra Street, Camas
Widening with sidewalk.
$650K
0.3 mi route · 15 crossings (9 unmarked) · 6 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Northwest Astor Street, Northwest 16th Avenue to Northwest McIntosh Road, Camas
Widening with bike lanes and sidewalk.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northwest Brady Road at Northwest McIntosh Road, Camas
Road, bike and pedestrian improvements.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Northwest Lake Road at Northwest Leadbetter Drive, Camas
Install pedestrian facilities (sidewalk) along NW Lake Road.
$783K · 26% secured · TA(UL), Local
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest Leadbetter Drive, Northwest Lake Road to Northwest Fremont Street, Camas
Sidewalk / path construction.
$250K
0.3 mi route · 10 crossings (6 unmarked) · 1 curb ramp
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 4 ↗
Northeast 232nd Avenue, Northeast 28th Street to North Shore Boulevard, Camas
Widen to 3 lanes with bike lanes and sidewalk.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 5 ↗
Northeast 242nd Avenue, Northeast 28th Street to North Shore Boulevard, Camas
Widen to 3 lanes with bike lanes and sidewalk.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 6 ↗
Northeast 28th Street, Northeast 232nd Avenue to Northeast 242nd Avenue, Camas
Widen to 3 lanes with bike lanes.
$5K
0.5 mi route · 7 crossings (7 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 5 ↗
Northeast 43rd Avenue at SR 500, Camas
Widen to 3 lanes with bike lanes and sidewalk.
$6.5M
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Northeast Ingle Road at Northeast Goodwin Road, Camas
Widen to 3 lanes with bike lanes and sidewalk.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 6 ↗
Northwest Astor Street, Northwest Sierra Street to Northwest 38th Avenue, Camas
Widening with bike lanes and sidewalk, NW Sierra to NW 38th.
$5K
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 5 ↗
Northwest McIntosh Road, Northwest Brady Road to Northwest 11th Avenue, Camas
Widening with bike lanes and sidewalk.
$5K
1.2 mi route · 32 crossings (28 unmarked) · 4 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Northwest Payne Street, Northwest Lake Road to Northwest Camas Meadows Drive, Camas
Widening with bike lanes and sidewalk.
$5K
0.4 mi route · 8 crossings (6 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 3 ↗
Southeast 15th Street at Northeast 283rd Avenue, Camas
Widen to 3 lanes with bike lanes and sidewalk near Camas High School.
$5K
318 ft route · 3 crossings (1 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 5 ↗
SR 500 at Northeast 43rd Avenue, Camas
Widen with bike lanes, sidewalks, turn lane, illumination and roundabouts.
$1.0M · Local
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 2 ↗
South 10th Street, Timm Road to Union Ridge Parkway, Ridgefield
New multimodal crossing of I-5 with a roundabout at Union Ridge Parkway and S 10th Street.
TIF, Developer, City, Federal CRP
0.4 mi route · 11 crossings (7 unmarked) · 2 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Carty Road at Hillhurst Road, Ridgefield
First phase of a multipurpose trail along Carty Road, including design, acquisition and construction of an enhanced crosswalk with RRFB at Hillhurst and Carty Road.
$278K · 42% secured · Local, State Capital grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Gee Creek Trail at Heron Drive, Ridgefield
Looped trail from Heron Drive at the Heron Ridge stormwater facility.
$1.4M · 60% secured · WFL, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 100 ↗
South Hillhurst Road at South Sevier Road, Ridgefield
New multimodal trail on the north side of S Hillhurst Road from S Sevier Road to Ridgefield High School.
$446K · 100% secured · TA(US), Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
65th Avenue, Pioneer Street to North 20th Street, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
299 ft route · 7 crossings (6 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
85th Avenue, South 5th Street to North 10th Street, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
0.2 mi route · 4 crossings (3 unmarked) · 1 curb ramp
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Ridgefield
Annual sidewalk repairs and improvements guided by the ADA Transition and Mobility/Access Plan.
Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Carty Road at Hillhurst Road, Ridgefield
Multipurpose trail along Carty Road from Hillhurst Road east for about half a mile.
Developer, Bike/Ped/Trail grant
1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Pioneer Street, Ridgefield
Storm drainage and pavement repair plus an enhanced pedestrian crossing of Pioneer Street.
Local, CDBG, PWF
4.7 mi route · 105 crossings (56 unmarked) · 31 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Gee Creek Trail, Abrams Park to Royle Road, Ridgefield
Extends the Gee Creek regional multi-use trail from Abrams Park to Royle Road, with slope stabilization.
$4.0M · State RCO, State/Federal Bike/Pedestrian, REET, Local
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Gee Creek Trail, Heron Drive to Main Avenue, Ridgefield
Extends Gee Creek Trail north and west from Heron Drive to Main Avenue near the Ridgefield Wildlife Refuge Carty Unit, plus preliminary design of a multimodal BNSF rail crossing along Division Street to the waterfront.
FLAP, TIF, Developer, State/Federal
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Hall Street at Elm Street, Ridgefield
Storm drainage, pavement repair, waterline and sidewalk.
Local, CDBG
167 ft route · 0 crossings · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Hillhurst Road, Pioneer Street to Sevier Road, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
0.3 mi route · 11 crossings (9 unmarked) · 4 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Hillhurst Road at Sevier Road, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
0.3 mi route · 11 crossings (9 unmarked) · 4 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Royle Road at North 10th Street, Ridgefield
Joint project with Cowlitz Indian Tribe including a roundabout at Royle Road and NW 289th Street and multimodal improvements.
Federal RCN, Water fund
0.1 mi route · 2 crossings (2 unmarked) · 1 curb ramp
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Pioneer Street, South 35th Avenue to Royle Road, Ridgefield
Widening to four lanes with median and multi-purpose trails.
$5.6M · TIF, Grant, Developer
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
South 15th Street, South 35th Avenue to Royle Road, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
0.2 mi route · 7 crossings (5 unmarked) · 3 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Royle Road, North 10th Street to Pioneer Street, Ridgefield
Frontage improvements with sidewalks, bike lanes and street lights.
Developer
0.1 mi route · 2 crossings (2 unmarked) · 1 curb ramp
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Royle Road, South 19th Street to Hillhurst Road, Ridgefield
Complete corridor rebuild with sidewalks, bike lanes, center median/turn lanes, culvert replacement at Gee Creek and safety improvements.
Local, REET, TIF
0.1 mi route · 2 crossings (2 unmarked) · 1 curb ramp
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
South 35th Avenue, Pioneer Street to South 15th Street, Ridgefield
Study, design and build a new multimodal connection between Pioneer Street and S 10th Way.
Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Sargent Street, Main Avenue to 3rd Avenue, Ridgefield
Storm drainage, pavement repair, waterline and new sidewalk.
Local, CDBG
259 ft route · 4 crossings (4 unmarked) · 0 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Ridgefield
Annual speed bumps and other traffic calming treatments based on a prioritized list.
Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
Union Ridge Parkway, Pioneer Street to North 10th Street, Ridgefield
Developer-built collector extension with sidewalks, bike lanes and street lights.
Developer
0.2 mi route · 7 crossings (6 unmarked) · 2 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 3 ↗
Highway 99, Northeast 102nd Street to Northeast 104th Street
Sidewalk along Highway 99 near NE 102nd to NE 104th Street, finishing construction.
$2.1M · TIF, Grants/Loans
0.1 mi route · 7 crossings (5 unmarked) · 1 curb ramp
Northeast 179th Street
Realign and upgrade arterial.
$600K · County, REET 2
5.8 mi route · 137 crossings (127 unmarked) · 3 curb ramps
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northeast 152nd Avenue, Padden Parkway to Northeast 99th Street
Road construction from Padden Parkway to NE 99th Street with curbs and sidewalks.
$7.6M · Clean Water Fee, STP-UL, TIF, UAP, Utility Reimbursable
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗
Northeast 179th Street, Northeast 29th Avenue to Northeast 50th Avenue
Roadway improvements on NE 179th Street including bike and pedestrian facilities, retaining walls and stormwater.
$28.9M · 10% secured · CRF, TIF, Grants/Loans, Local
1.0 mi route · 32 crossings (32 unmarked) · 1 curb ramp
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗Clark County 2026-2031 TIP (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northeast 68th Street, Highway 99 to Northeast Saint Johns Road
Sidewalk on NE 68th Street from Highway 99 to NE St. Johns Road, wrapping up construction.
$8.4M · CRF, TIF, Grants/Loans
1.3 mi route · 42 crossings (40 unmarked) · 3 curb ramps
Northeast 72nd Avenue, Northeast 122nd Street to Northeast 133rd Street
Road improvement with curbs and sidewalks from NE 122nd to NE 133rd Street; design funded.
$200K · TIF
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗
Northeast 99th Street, Northeast 94th Avenue to Northeast 117th Avenue
Carry-over road project with curbs, sidewalks and bikeways from NE 94th Avenue to near NE 117th Avenue.
$100K · TIF
1.5 mi route · 41 crossings (29 unmarked) · 1 curb ramp
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 2 ↗
Northeast Salmon Creek Avenue at Northeast Salmon Creek Street
Realignment from WSUV entrance to NE Salmon Creek Street with sidewalks and bikeways; design funded.
$290K · County, REET 2, STP-UL, TIF, UAP
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗
Northeast 88th Street at Northeast 25th Avenue
Safety improvements at the NE 88th Street and NE 25th Avenue intersection. The document does not specify walking or biking elements.
$621K · CRF, Grants
Show on the mapClark County 2026-2031 TIP (adopted), p. 7 ↗Clark County 2027-2032 TIP (draft), p. 8 ↗
Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail
Trail crossing of NE Hazel Dell Avenue for the Burnt Bridge Creek Trail near 5200-5400 NE Hazel Dell Ave.
$286K · CRF
0.1 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗
Northeast Lucia Falls Road, Northeast 294th Street to Northeast Sunset Falls Road
Safety improvements on NE Lucia Falls Road near NE 294th Street and NE Sunset Falls Road. The document does not specify walking or biking elements.
$857K · CRF, Grants
Show on the mapClark County 2026-2031 TIP (adopted), p. 7 ↗Clark County 2027-2032 TIP (draft), p. 8 ↗
Various locations
Annual ADA curb ramp and accessibility improvements tied to paving, 2026-2035 batches.
CRF, Grants/Loans
Southeast Crown Road, Southeast 23rd Street to West Fir Court
Separated pedestrian and bicycle facilities, ADA ramps, RRFBs and school crossing upgrades.
$5.2M · 97% secured · TA(UL), CMAQ, Local
Show on the mapClark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Various locations
Countywide program building sidewalks and ADA accessibility improvements.
$58.7M · CRF, TIF, Grants/Loans, Other
Clark County 2026 Annual Construction Program (adopted), p. 3 ↗Clark County 2026-2031 TIP (adopted), p. 2 ↗Clark County 2027-2032 TIP (draft), p. 3 ↗
Various locations
Countywide program of traffic safety improvements.
$27.9M · CRF, TIF, Grants/Loans
Clark County 2026 Annual Construction Program (adopted), p. 3 ↗Clark County 2026-2031 TIP (adopted), p. 2 ↗Clark County 2027-2032 TIP (draft), p. 3 ↗
Northeast 44th Street, Northeast 47th Avenue to Northeast 40th Avenue
School zone sidewalks, ADA ramps, RRFBs with lighting and school crossing upgrades near Truman School.
$2.0M · 71% secured · SRTS, TIB, Local
0.3 mi route · 15 crossings (12 unmarked) · 3 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Highway 99, Northeast 110th Street to Northeast 117th Street
New curb and sidewalk on the east side of Highway 99 filling the gap from NE 110th Street to near NE 117th Street, plus stormwater and signal upgrades.
$4.0M · 65% secured · TA(UL), Local
0.3 mi route · 16 crossings (10 unmarked) · 2 curb ramps
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northwest 139th Street, Northwest 10th Avenue to Northwest 26th Avenue
School zone sidewalks, ADA ramps, RRFBs with lighting, school crossing upgrades and flashers.
$1.6M · 78% secured · TA(UL), Local
Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗
Northeast 15th Avenue, Northeast 179th Street to Northeast 10th Avenue
Extends NE 15th Avenue northwest from NE 179th Street as a new minor arterial to NE 10th Avenue, with pedestrian and bicycle facilities.
$18.7M · 77% secured · STBG(UL), Local
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Northeast 179th Street, Northeast 15th Avenue to Northeast 26th Avenue
Widens NE 179th Street to arterial standard with bike lanes and sidewalks, and builds a roundabout at NE 15th Avenue.
$25.4M · 85% secured · STBG(UL), Local
0.6 mi route · 24 crossings (21 unmarked) · 0 curb ramps
Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
32nd Street, Addy Street to F Street, Washougal
New rail overpass at 32nd Street with rebuilt roundabout intersections including sidewalks and bicycle facilities.
$90.0M · 98% secured · STBG(UL), DEMO, Railroad Crossing Elimination Grant, MAW, Local
0.3 mi route · 24 crossings (15 unmarked) · 2 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 114 ↗
39th Street, Evergreen Way to J Street, Washougal
Safe routes to school project with lane narrowing, sidewalks, buffered bike lanes, high-visibility crosswalks with rapid flashing beacons, ADA ramps, speed humps and safety education.
$2.6M · 85% secured · SRTS, Local
0.5 mi route · 21 crossings (15 unmarked) · 1 curb ramp
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
Washougal
Signing, markings, curb bulb-outs, traffic circles and sight distance improvements at various intersections, shortening crossings and calming traffic.
$522K · 77% secured · HSIP
32nd Street, Webster Road to W Street, Washougal
Widens 32nd Street from Webster Road to W Street with sidewalk, pedestrian crossing improvements, ADA curb ramps, street lights and intersection improvements.
$17.9M · 8% secured · STBG(UL), Local
492 ft route · 11 crossings (9 unmarked) · 1 curb ramp
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
South 27th Street, Main Street to Index Street, Washougal
New separated shared use path along the east side of 27th Street between Main Street and Index Street.
$2.6M · 81% secured · TA(UL), Local
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
Fourth Plain Boulevard, Vancouver
Extend BRT service along Fourth Plain and 162nd/164th Avenue between Vancouver Mall and Fisher's Landing Transit Centers, mainly building BRT stations.
$57.5M · 100% secured · CMAQ, WSDOT, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗Vancouver 2027-2032 TIP (adopted), p. 53 ↗
District Wide
Enhanced mobility for seniors and people with disabilities through travel training, transportation services, vehicles and mobility management.
$5.3M · 100% secured · 5310, Local
District Wide
Purchase transit buses, some possibly hybrid, electric or hydrogen fuel cell.
$8.0M · 100% secured · 5339, 5337, Local
Highway 99, Vancouver
Build BRT stations and transit improvements for Bus Rapid Transit along Highway 99 from Vancouver Waterfront to Salmon Creek.
$33.9M · 63% secured · Local, CMAQ, STBG, CRP
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗Vancouver 2027-2032 TIP (adopted), p. 53 ↗
SR 503 at Northwest Onsdorff Boulevard, Battle Ground
Build a roundabout with sidewalks, landscaping and streetlighting.
$5.0M · 2% secured · Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 66 ↗
Southeast Grace Avenue, East Main Street to Southeast Rasmussen Boulevard, Battle Ground
Realign and widen to three lanes with sidewalks, bike facilities, lighting and a new signal at Main and Grace.
$12.1M · 61% secured · STBG(UL), TIB, Local
0.4 mi route · 23 crossings (19 unmarked) · 6 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 67 ↗
Northwest 5th Street, SR 503 to Parkway Avenue, Battle Ground
Construct a new urban neighborhood collector with sidewalks and bike lanes, storm drainage, landscaping and signing.
$4.5M · 95% secured · CWA, Local
0.3 mi route · 18 crossings (14 unmarked) · 8 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗
Southwest Eaton Boulevard, SR 503 to Southwest 20th Avenue, Battle Ground
Reconstruct SW Eaton Boulevard to three lanes with bike lanes and sidewalks, add signal at SW 20th Avenue and rebuild signal at SR 503.
$16.2M · 86% secured · STBG(UL), Other, Local
0.5 mi route · 10 crossings (4 unmarked) · 2 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 68 ↗
I-5, Vancouver
Design and construction of new I-5 bridges over the Columbia River accommodating highway, transit and active transportation, and removal of the existing Interstate Bridge.
$5.0B · 96% secured · Discretionary (Mega), NHPP, MAW, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
I-5, Vancouver
Post-NEPA design of light rail transit extension, track, systems and stations to apply for a federal Capital Investment Grant.
$50.7M · 100% secured · Discretionary (Mega)
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
I-5 at Northeast 179th Street
WSDOT portion of I-5/179th Street interchange and roadway improvements, a partnership with Clark County.
$86.5M · 89% secured · CWA
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 132 ↗
SR 141
Grind and inlay pavement on SR 141 between Bingen and White Salmon and add ADA and complete streets features for people walking and biking.
$5.4M · 85% secured · MVA
Show on the mapRTC Klickitat and Skamania County 2027-2030 TIP (adopted), p. 20 ↗
Fairgrounds Road, Fairgrounds Entrance to Byers Street
Construct sidewalks, ADA curb ramps, curb and gutter, signing, markings and streetscape from the fairgrounds entrance to Byers Street.
$1.0M · 93% secured · TA(R), Local
Lead agency: Klickitat County
Show on the mapRTC Klickitat and Skamania County 2027-2030 TIP (adopted), p. 18 ↗
Northwest 31st Avenue
Widen shoulders, add raised markings or rumble strips and streetlights on NW 31st Avenue.
$750K · 100% secured · HSIP
Lead agency: Cowlitz Indian Tribe
5.9 mi route · 102 crossings (98 unmarked) · 7 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 97 ↗
Alder Street, Steuben Street to Franklin Street, Bingen
Infill sidewalk gaps along both Alder Street and Cedar Street between Steuben and Franklin.
$935K · 89% secured · TA(US), TIB, Local
Lead agency: City of Bingen
RTC Klickitat and Skamania County 2027-2030 TIP (adopted), p. 18 ↗
Lower River Road, Vancouver
Trail improvement along Lower River Road (partially funded).
Lead agency: Port of Vancouver
La Center Road at Paradise Park Road, La Center
10-foot-wide shared use path along La Center Road to the Lewis River bridge.
$8.6M · 9% secured · TA(R), Local
1.0 mi route · 15 crossings (15 unmarked) · 0 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗