Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
8
Planned
$195M
On agendas
0

Not counted: I-5 Columbia River Bridge Replacement ($5.0B), which alone would be 96% of the total.

  • Funded, phase unclear 8

8 of 205 projects · Bridge: A bridge project with a walking, biking or transit part. · Clear filters

Vancouver3 projects · $53.1M

  1. Northwest 32nd Avenue Freight and Mobility - Northwest 61st Street to Burnt Bridge Creek

    Northwest Lakeshore Avenue, Northwest 61st Street to Burnt Bridge Creek, Vancouver

    Rebuilds Lakeshore/Fruit Valley and the BNSF bridge with mobility lanes, sidewalks and a 10-foot west-side multi-use path. Outside 6-year horizon.

    $49.0M

    Sidewalks along the route today: 16%OS-CONNECT, Nov 2026 ↗

    0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 100 ↗

Camas2 projects · $51.4M

Washougal1 project · $90.0M

  1. Funded, phase unclear2027–2030BridgeStreet rebuildWalkingBiking

    32nd Street Rail Overpass Project

    32nd Street, Addy Street to F Street, Washougal

    New rail overpass at 32nd Street with rebuilt roundabout intersections including sidewalks and bicycle facilities.

    $90.0M · 98% secured · STBG(UL), DEMO, Railroad Crossing Elimination Grant, MAW, Local

    Sidewalks along the route today: 100% · both sides 95%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 24 crossings (15 unmarked) · 2 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 114 ↗

Ridgefield1 project

  1. Funded, phase unclearfrom 2026BridgeStreet rebuildWalkingBiking

    S 10th/11th Street Crossing of I-5, Timm Road to Union Ridge Parkway

    South 10th Street, Timm Road to Union Ridge Parkway, Ridgefield

    New multimodal crossing of I-5 with a roundabout at Union Ridge Parkway and S 10th Street.

    TIF, Developer, City, Federal CRP

    Sidewalks along the route today: 100% · both sides 98%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 11 crossings (7 unmarked) · 2 curb ramps

    Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

WSDOT1 project · $5.0B

  1. Funded, phase unclearMegaproject, not in the page total2027–2029BridgeTransitWalkingBiking

    I-5 Columbia River Bridge Replacement

    I-5, Vancouver

    Design and construction of new I-5 bridges over the Columbia River accommodating highway, transit and active transportation, and removal of the existing Interstate Bridge.

    $5.0B · 96% secured · Discretionary (Mega), NHPP, MAW, Local

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    325 ft route · 0 crossings · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗