Rossiter Lane to Burnt Bridge Creek Pedestrian Connector (SS4A)
Rossiter Lane at Burnt Bridge Creek Trail, Vancouver
New pedestrian bridge creating a connection to the Burnt Bridge Creek Trail.
$1.6M · 61% secured · SS4A
Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.
The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.
Not counted: I-5 Columbia River Bridge Replacement ($5.0B), which alone would be 96% of the total.
8 of 205 projects · Bridge: A bridge project with a walking, biking or transit part. · Clear filters
Rossiter Lane at Burnt Bridge Creek Trail, Vancouver
New pedestrian bridge creating a connection to the Burnt Bridge Creek Trail.
$1.6M · 61% secured · SS4A
Northwest Lakeshore Avenue, Northwest 61st Street to Burnt Bridge Creek, Vancouver
Rebuilds Lakeshore/Fruit Valley and the BNSF bridge with mobility lanes, sidewalks and a 10-foot west-side multi-use path. Outside 6-year horizon.
$49.0M
0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps
West 11th Street, Vancouver
Multimodal grade-separated crossing of the railroad at West 11th Street to improve safety.
$2.5M
0.7 mi route · 40 crossings (19 unmarked) · 5 curb ramps
North Shore Boulevard, North Benton Drive to SR 500, Camas
New road construction including complete streets and a bridge.
$25.0M · Local
0.2 mi route · 6 crossings (5 unmarked) · 0 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗
SR 500, Northeast Lake Road to Northeast 35th Avenue, Camas
Widen SR-500 with multimodal facilities, illumination, bridge replacement and a roundabout.
$26.4M · Local
0.3 mi route · 9 crossings (3 unmarked) · 3 curb ramps
Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗
32nd Street, Addy Street to F Street, Washougal
New rail overpass at 32nd Street with rebuilt roundabout intersections including sidewalks and bicycle facilities.
$90.0M · 98% secured · STBG(UL), DEMO, Railroad Crossing Elimination Grant, MAW, Local
0.3 mi route · 24 crossings (15 unmarked) · 2 curb ramps
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 114 ↗
South 10th Street, Timm Road to Union Ridge Parkway, Ridgefield
New multimodal crossing of I-5 with a roundabout at Union Ridge Parkway and S 10th Street.
TIF, Developer, City, Federal CRP
0.4 mi route · 11 crossings (7 unmarked) · 2 curb ramps
Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗
I-5, Vancouver
Design and construction of new I-5 bridges over the Columbia River accommodating highway, transit and active transportation, and removal of the existing Interstate Bridge.
$5.0B · 96% secured · Discretionary (Mega), NHPP, MAW, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗