Amtrak Multimodal Access - West 11th Street
West 11th Street, King Street to Hill Street, Vancouver
Mobility lanes and pedestrian access on West 11th Street from King Street to the Amtrak Station.
$10.0M
Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.
The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.
Not counted: I-5 Columbia River Bridge Replacement ($5.0B), which alone would be 96% of the total.
13 of 205 projects · Transit: Bus service, stops, stations or bus rapid transit. · Clear filters
West 11th Street, King Street to Hill Street, Vancouver
Mobility lanes and pedestrian access on West 11th Street from King Street to the Amtrak Station.
$10.0M
Fourth Plain Boulevard, Northeast 121st Avenue to Northeast 127th Avenue, Vancouver
Safety improvements on a high-crash segment of Fourth Plain served by bus rapid transit, possibly including road reconfiguration, signal phasing changes, lighting and reduced crash exposure for vulnerable users. Outside 6-year horizon.
$1.0M
Citywide, Vancouver
Proposed program to inventory and prioritize lighting at crossings, high-ridership bus stops and high-need pedestrian locations. Unfunded.
East Fourth Plain Boulevard at Neals Lane, Vancouver
Pedestrian and ADA improvements on East Fourth Plain Boulevard, including a HAWK beacon and pedestrian refuges west of Reserve Street and at Neals Lane, improving safety and transit access.
$770K · SS4A
Main Street, East 39th Street to Northeast 45th Street, Vancouver
Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.
$4.0M · 38% secured · Local, Grant
0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp
East Mill Plain Boulevard, Boise Avenue to North Andresen Road, Vancouver
Narrower lanes, protected mobility lanes, better sidewalks, planter strips and crossings at Ogden, Missoula and Helena, accommodating future BRT.
$10.0M
1.0 mi route · 18 crossings (2 unmarked) · 10 curb ramps
Main Street, Fourth Plain Boulevard to East 37th Street, Vancouver
Removes a northbound lane, adds marked crossings with median islands at 31st and 35th Streets, wayfinding and a 25 mph limit, coordinated with C-TRAN Highway 99 BRT.
$1.0M
Fourth Plain Boulevard, Vancouver
Extend BRT service along Fourth Plain and 162nd/164th Avenue between Vancouver Mall and Fisher's Landing Transit Centers, mainly building BRT stations.
$57.5M · 100% secured · CMAQ, WSDOT, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗Vancouver 2027-2032 TIP (adopted), p. 53 ↗
District Wide
Enhanced mobility for seniors and people with disabilities through travel training, transportation services, vehicles and mobility management.
$5.3M · 100% secured · 5310, Local
District Wide
Purchase transit buses, some possibly hybrid, electric or hydrogen fuel cell.
$8.0M · 100% secured · 5339, 5337, Local
Highway 99, Vancouver
Build BRT stations and transit improvements for Bus Rapid Transit along Highway 99 from Vancouver Waterfront to Salmon Creek.
$33.9M · 63% secured · Local, CMAQ, STBG, CRP
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗Vancouver 2027-2032 TIP (adopted), p. 53 ↗
I-5, Vancouver
Design and construction of new I-5 bridges over the Columbia River accommodating highway, transit and active transportation, and removal of the existing Interstate Bridge.
$5.0B · 96% secured · Discretionary (Mega), NHPP, MAW, Local
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗
I-5, Vancouver
Post-NEPA design of light rail transit extension, track, systems and stations to apply for a federal Capital Investment Grant.
$50.7M · 100% secured · Discretionary (Mega)
Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗