Progress Tracker

Walking, biking and transit projects in the region's official plans: what they cost and how close they are to being built.

Updated November 20 · Where this comes from

The system reads the Transportation Improvement Programs of RTC (which lists projects for every agency in the county) and of Vancouver, Clark County, Camas and Ridgefield, and checks for new versions every week. Each project's phase, cost and type tags come from what its plan says. Figures can be off, so check the source document linked on each project before you quote them.

Projects
141
Planned
$900M
On agendas
0

Not counted: I-5 Columbia River Bridge Replacement ($5.0B), which alone would be 85% of the total.

  • Funded, phase unclear 141

141 of 205 projects · Walking: Adds or improves sidewalks, crossings or curb ramps. · Clear filters

Vancouver62 projects · $413M

  1. Funded, phase unclear2026–2027TrailWalkingBiking

    Evergreen Trail - Chelsea to Image

    Southeast Evergreen Highway, Southeast Chelsea Avenue to Southeast Image Road, Vancouver

    Upgrade roadway with a 6 to 10 foot pedestrian pathway on the south side, a priority east-west walking and biking corridor.

    $4.0M · 63% secured · Grant, Local

    Sidewalks along the route today: 8%OS-CONNECT, Nov 2026 ↗

    1.1 mi route · 62 crossings (62 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  2. Funded, phase unclear2026–2027Walking

    Garrison Road Sidewalk Infill - Mill Plain to Northeast 12th Street

    Garrison Road, Mill Plain Boulevard to Northeast 12th Street, Vancouver

    Install sidewalks and ADA ramps along Garrison Road from Mill Plain to David Douglas Park/NE 12th Street.

    $1.6M · 63% secured · Grant

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  3. Funded, phase unclear2026–2027TrailWalkingBikingStreet safety

    Hazel Dell Avenue and Burnt Bridge Creek Trail Crossing Improvements

    Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail, Vancouver

    Adds a designated crossing of Hazel Dell Avenue connecting the city and county segments of the Burnt Bridge Creek Trail.

    $1.0M · 70% secured · Grant, Local

    Sidewalks along the route today: 100% · both sides 96%OS-CONNECT, Nov 2026 ↗

    0.2 mi route · 10 crossings (9 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  4. Funded, phase unclearfrom 2026Street rebuildBikingWalkingStreet safety

    MacArthur Boulevard - Blandford Drive to Lieser Road

    MacArthur Boulevard, Blandford Drive to Lieser Road, Vancouver

    Moves vehicle travel to the east side of the median and converts the west side to separated mobility lanes, pedestrian facilities and a greenbelt, with improved crossings at Blandford, Phoenix, Texas and Burdick.

    $15.0M · 27% secured · Grant

    Sidewalks along the route today: 100% · both sides 80%OS-CONNECT, Nov 2026 ↗

    180 ft route · 3 crossings (3 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 107 ↗

  5. Funded, phase unclear2026–2027Street rebuildWalkingBikingStreet safety

    McGillivray Complete Street and Paving Project - Chkalov Drive to Southeast 164th Avenue

    Southeast McGillivray Boulevard, Southeast Chkalov Drive to Southeast 164th Avenue, Vancouver

    Complete street safety improvements for walking, biking and mobility devices on McGillivray Boulevard, done with the planned repaving.

    $7.5M · Local

    Sidewalks along the route today: 69% · both sides 59%OS-CONNECT, Nov 2026 ↗

    2.6 mi route · 75 crossings (43 unmarked) · 7 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  6. Funded, phase unclear2026–2028Street rebuildWalkingBiking

    Northeast 18th Street - Northeast 97th Avenue to Northeast 107th Avenue

    Northeast 18th Street, Northeast 97th Avenue to Northeast 107th Avenue, Vancouver

    New and upgraded multimodal arterial with mobility lanes, sidewalk, ADA ramps and a multi-use path, with roundabouts being evaluated at intersections. Design and right-of-way work is continuing.

    $25.0M · 40% secured · Local, Grant

    Sidewalks along the route today: 54% · both sides 3%OS-CONNECT, Nov 2026 ↗

    0.2 mi route · 9 crossings (7 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  7. Funded, phase unclear2026–2027WalkingStreet safety

    Northeast 18th Street and Devine Road ADA Improvements (SS4A)

    Northeast 18th Street at Northeast Devine Road, Vancouver

    ADA access improvements at NE 18th Street and Devine Road, funded through the Multimodal Safety and Accessibility program; part of the Safe Streets for All package.

    $550K · 100% secured · SS4A, Local, TRANS-844 Multimodal Safety and Accessibility

    Sidewalks along the route today: 20%OS-CONNECT, Nov 2026 ↗

    0.1 mi route · 6 crossings (6 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  8. Funded, phase unclear2026–2027WalkingStreet safetyTransit

    Northeast Fourth Plain Boulevard - Enhanced Pedestrian Crossings (SS4A)

    East Fourth Plain Boulevard at Neals Lane, Vancouver

    Pedestrian and ADA improvements on East Fourth Plain Boulevard, including a HAWK beacon and pedestrian refuges west of Reserve Street and at Neals Lane, improving safety and transit access.

    $770K · SS4A

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  9. Funded, phase unclear2026–2027Street rebuildWalkingBikingTransitStreet safety

    Upper Main Street Complete Street and Paving Project - East 39th to Northeast 45th Street/Hazel Dell

    Main Street, East 39th Street to Northeast 45th Street, Vancouver

    Repave and restripe Main Street with curb ramps, a mobility lane, two-way bikeway, multiuse path, new marked crossings, RRFB and median island at 39th and F, and lane changes to accommodate buses, coordinated with C-TRAN Highway 99 BRT.

    $4.0M · 38% secured · Local, Grant

    Sidewalks along the route today: 100% · both sides 73%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 17 crossings (5 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 47 ↗

  10. Funded, phase unclear2027–2028Walking

    34th Street Sidewalk Connection (SS4A)

    East 34th Street, Fourth Plain Boulevard to Northeast 34th Street, Vancouver

    New north-south pedestrian connection between Fourth Plain and NE 34th Street, between NE 57th and 62nd Avenues; exact location TBD.

    $435K · 77% secured · SS4A

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    282 ft route · 8 crossings (8 unmarked) · 2 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 47 ↗

  11. Funded, phase unclear2027–2032Street safetyWalkingBiking

    Neighborhood Traffic Management Program

    Citywide, Vancouver

    Ongoing traffic calming program with education or infrastructure to reduce driver speeds and new or improved facilities for people walking, biking and using mobility devices. Annual budget $300,000.

    $1.8M · Dedicated Street Funding, Local

    Vancouver 2027-2032 TIP (adopted), p. 56 ↗

  12. Funded, phase unclear2027–2029BikingStreet safetyStreet rebuildWalking

    Northeast 112th Avenue Complete Street and Paving Project - Mill Plain Boulevard to Northeast 28th Street

    Northeast 112th Avenue, Mill Plain Boulevard to Northeast 28th Street, Vancouver

    Repave and rechannelize to one general purpose lane plus a center turn lane, adding buffered/protected mobility lanes between Mill Plain and 18th Street.

    $3.5M · 100% secured · Grant, Local

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 46 ↗

  13. Funded, phase unclearfrom 2027Street rebuildWalkingBikingStreet safety

    Northeast 18th Street - Northeast 141st Avenue to Northeast 162nd Avenue

    Northeast 18th Street, Northeast 141st Avenue to Northeast 162nd Avenue, Vancouver

    Upgrade to a 5-lane principal arterial with separated and protected mobility lanes, sidewalk, ADA ramps and a south-side shared use path. Construction is set to start in 2027.

    $18.4M · 41% secured · Grant

    Sidewalks along the route today: 79% · both sides 10%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 46 crossings (33 unmarked) · 9 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 63 ↗

  14. Funded, phase unclear2027Street rebuildWalkingBikingTrail

    Northeast 192nd Avenue - Northeast 18th Street to Southeast 1st Street

    Northeast 192nd Avenue, Northeast 18th Street to Southeast 1st Street, Vancouver

    Urban upgrade of a 2-lane street with added lanes, sidewalks, mobility lanes and ADA ramps. A federal grant funds design and an RTC grant funds right-of-way.

    $21.2M · 34% secured · STBG(UL), Local, Federal grant, RTC, RTC grant

    Sidewalks along the route today: 65% · both sides 3%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 31 crossings (26 unmarked) · 3 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 105 ↗Vancouver 2027-2032 TIP (adopted), p. 66 ↗

  15. Funded, phase unclear2027–2032Street rebuildWalkingBikingStreet safety

    Northeast 28th Street - Northeast 138th Avenue to Northeast 162nd Avenue

    Northeast 28th Street, Northeast 138th Avenue to Northeast 162nd Avenue, Vancouver

    Upgrade rural 2-lane road to urban 3-lane minor arterial with sidewalks, mobility lanes, streetlights, signals and school crossings.

    $14.5M · 40% secured · STBG(UL), Local, Grant

    Sidewalks along the route today: 85% · both sides 56%OS-CONNECT, Nov 2026 ↗

    1.2 mi route · 66 crossings (52 unmarked) · 11 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 59 ↗

  16. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 72nd Avenue Safety and Mobility Complete Street

    Northeast 72nd Avenue, Northeast 40th Street to Northeast 78th Street, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $1.5M · Local

    Sidewalks along the route today: 96% · both sides 70%OS-CONNECT, Nov 2026 ↗

    1.9 mi route · 81 crossings (66 unmarked) · 15 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  17. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 86th/Northeast 87th Avenues Safety and Mobility Complete Street

    Northeast 87th Avenue, Fourth Plain Boulevard to Mill Plain Boulevard, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $2.1M · Local

    Sidewalks along the route today: 100% · both sides 80%OS-CONNECT, Nov 2026 ↗

    154 ft route · 4 crossings (4 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  18. Funded, phase unclear2027–2029Street safetyStreet rebuildWalkingBiking

    Northeast 97th/98th Avenues Safety and Mobility Complete Street

    Northeast 97th Avenue, Northeast Burton Road to Mill Plain Boulevard, Vancouver

    Safety and mobility complete street project coordinated with pavement preservation, adding modal choices.

    $1.7M · Local

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 7 crossings (7 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  19. Funded, phase unclear2027–2032Walking

    Sidewalk Management Program

    Citywide, Vancouver

    Citywide program, $500,000 per year, managing sidewalks and ADA curb ramps and helping owners fix frontage deficiencies.

    $3.0M · Local

    Vancouver 2027-2032 TIP (adopted), p. 52 ↗

  20. Funded, phase unclear2027–2028WalkingStreet safetyBiking

    Walnut Grove Elementary School Sidewalk and Pedestrian Crossing Improvements (SRTS)

    Northeast 72nd Avenue, Northeast 54th Street to Northeast 60th Street, Vancouver

    High-visibility crosswalks, lighting, ADA ramps, accessible signals, buffered sidewalk and speed cushions along NE 72nd Avenue at Walnut Grove Elementary.

    $2.0M · 100% secured · SRTS, Safe Routes to School

    Sidewalks along the route today: 90% · both sides 46%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 18 crossings (14 unmarked) · 4 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 113 ↗Vancouver 2027-2032 TIP (adopted), p. 46 ↗

  21. Funded, phase unclear2028–2029BikingWalkingStreet rebuildStreet safety

    112th Avenue/Chkalov Drive Complete Street and Paving Project - Northeast 28th Street to Northeast 51st Street

    Northeast 112th Avenue, Northeast 28th Street to Northeast 51st Street, Vancouver

    Repave and restripe NE 112th Avenue to add bike and small mobility lanes, a neighborhood greenway alternate route with traffic calming and wayfinding, shared lane markings, and a long-term two-way shared use path on the east side.

    $4.0M · Local

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 48 ↗

  22. Funded, phase unclear2028–2032Street rebuildWalkingBiking

    Northeast 49th Street Corridor Completion - Northeast 122nd Avenue to Northeast 137th Avenue

    Northeast 49th Street, Northeast 122nd Avenue to Northeast 137th Avenue, Vancouver

    Upgrade 2-lane street to 3-lane urban minor arterial with sidewalks, ADA ramps, mobility lanes and streetlights.

    $14.3M · 13% secured · STBG(UL), Local, Grant

    Sidewalks along the route today: 95% · both sides 47%OS-CONNECT, Nov 2026 ↗

    0.8 mi route · 31 crossings (23 unmarked) · 7 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Vancouver 2027-2032 TIP (adopted), p. 60 ↗

  23. 112th Avenue/Chkalov Drive Complete Street Project - Southeast 3rd Street to McGillivray Boulevard

    Southeast Chkalov Drive, Southeast 3rd Street to Southeast McGillivray Boulevard, Vancouver

    Road reconfiguration with protected bike and small mobility lanes, enhanced pedestrian crossing, signal modification and ADA ramps.

    $1.3M

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 11 crossings (2 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 160 ↗

  24. East 29th Street Complete Street and Paving Project

    East 29th Street, I-5 to Neals Lane, Vancouver

    Lower speed limit, add speed cushions, shared lane markings, traffic circles, an improved Grand Boulevard crossing with pedestrian island and bike crossing, fill sidewalk gaps and add wayfinding.

    $700K

    Sidewalks along the route today: 81% · both sides 65%OS-CONNECT, Nov 2026 ↗

    1.3 mi route · 79 crossings (72 unmarked) · 6 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 163 ↗

  25. East 33rd Street Complete Street & Paving Project

    East 33rd Street, I-5 to Grand Boulevard, Vancouver

    Repave and restripe East 33rd Street with lower speed limits, buffered mobility lanes, an RRFB with raised crossing at F Street, speed humps, shared lane markings and intersection improvements at Grand.

    $2.0M

    Sidewalks along the route today: 97% · both sides 94%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 71 crossings (50 unmarked) · 18 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 162 ↗

  26. East Mill Plain Boulevard - Boise Avenue to North Andresen Road

    East Mill Plain Boulevard, Boise Avenue to North Andresen Road, Vancouver

    Narrower lanes, protected mobility lanes, better sidewalks, planter strips and crossings at Ogden, Missoula and Helena, accommodating future BRT.

    $10.0M

    Sidewalks along the route today: 100% · both sides 93%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 18 crossings (2 unmarked) · 10 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 106 ↗

  27. North Devine Road - South of Mill Plain Boulevard to MacArthur Boulevard

    North Devine Road, East Mill Plain Boulevard to MacArthur Boulevard, Vancouver

    Two-way protected mobility lane on the west side, improved sidewalks and ADA access, planter strips and enhanced crossings. Outside 6-year horizon.

    $4.0M

    Sidewalks along the route today: 98% · both sides 96%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 8 crossings · 4 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 108 ↗

  28. Northeast 112th Avenue/Southeast Chkalov Drive Complete Street Project - Northeast 2nd Street to Southeast 3rd Street

    Northeast 112th Avenue, Northeast 2nd Street to Southeast 3rd Street, Vancouver

    Complete street retrofit with shared-use paths, ADA ramps, curb and gutter, signal modification, markings and landscaping.

    $4.5M

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    115 ft route · 4 crossings (4 unmarked) · 2 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 174 ↗

  29. Northwest 32nd Avenue Freight and Mobility - Northwest 61st Street to Burnt Bridge Creek

    Northwest Lakeshore Avenue, Northwest 61st Street to Burnt Bridge Creek, Vancouver

    Rebuilds Lakeshore/Fruit Valley and the BNSF bridge with mobility lanes, sidewalks and a 10-foot west-side multi-use path. Outside 6-year horizon.

    $49.0M

    Sidewalks along the route today: 16%OS-CONNECT, Nov 2026 ↗

    0.2 mi route · 3 crossings (3 unmarked) · 0 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 100 ↗

  30. Funded, phase unclearWalking

    Southeast 10th Street Sidewalks - Southeast 98th Avenue to Southeast Ellsworth Road

    Southeast 10th Street, Southeast 98th Avenue to Southeast Ellsworth Road, Vancouver

    Installs sidewalks and ADA ramps on SE 10th Street where none exist, completing an east/west active transportation corridor. Outside 6-year horizon.

    $2.0M

    Sidewalks along the route today: 33% · both sides 2%OS-CONNECT, Nov 2026 ↗

    0.5 mi route · 37 crossings (31 unmarked) · 2 curb ramps

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 90 ↗

  31. Funded, phase unclearWalkingBikingTrail

    Southeast Evergreen Highway Pathway - Southeast Image Road to Southeast 100th Court

    Southeast Evergreen Highway, Southeast Image Road to Southeast 100th Court, Vancouver

    Adds a 6 to 10 foot pedestrian pathway on the south side of SE Evergreen Highway, a priority east/west walking and biking corridor. Design and right-of-way funded; construction unfunded.

    $1.0M

    Sidewalks along the route today: 1%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 47 crossings (47 unmarked) · 1 curb ramp

    Show on the mapVancouver 2027-2032 TIP (adopted), p. 86 ↗

Camas28 projects · $144M

  1. Funded, phase unclear2028Street rebuildWalkingBiking

    SR-500 (Everett St) Widening, NE 35th Ave to NE 43rd Ave

    SR 500, Northeast 35th Avenue to Northeast 43rd Avenue, Camas

    Improve SR-500/Everett Street to urban arterial standards with pedestrian and bicycle facilities, lighting and stormwater.

    $15.5M · 9% secured · STBG(UL), Local

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 16 crossings (13 unmarked) · 0 curb ramps

    Show on the mapCamas 2027-2032 Six Year Street Plan (TIP) Project List, p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗

Ridgefield21 projects · $11.8M

  1. Funded, phase unclearfrom 2026BridgeStreet rebuildWalkingBiking

    S 10th/11th Street Crossing of I-5, Timm Road to Union Ridge Parkway

    South 10th Street, Timm Road to Union Ridge Parkway, Ridgefield

    New multimodal crossing of I-5 with a roundabout at Union Ridge Parkway and S 10th Street.

    TIF, Developer, City, Federal CRP

    Sidewalks along the route today: 100% · both sides 98%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 11 crossings (7 unmarked) · 2 curb ramps

    Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

  2. Funded, phase unclear2027TrailWalkingBikingStreet safety

    Carty Road Multi-Purpose Trail Phase 1

    Carty Road at Hillhurst Road, Ridgefield

    First phase of a multipurpose trail along Carty Road, including design, acquisition and construction of an enhanced crosswalk with RRFB at Hillhurst and Carty Road.

    $278K · 42% secured · Local, State Capital grant

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    1.6 mi route · 28 crossings (28 unmarked) · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

  3. Funded, phase unclearTrailWalkingBiking

    Gee Creek Trail, Heron Dr to Main Ave

    Gee Creek Trail, Heron Drive to Main Avenue, Ridgefield

    Extends Gee Creek Trail north and west from Heron Drive to Main Avenue near the Ridgefield Wildlife Refuge Carty Unit, plus preliminary design of a multimodal BNSF rail crossing along Division Street to the waterfront.

    FLAP, TIF, Developer, State/Federal

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    502 ft route · 0 crossings · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 40 ↗Ridgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

  4. Royle Road South, S. 19th St to Hillhurst Rd., Phase 2 Complete Corridor

    Royle Road, South 19th Street to Hillhurst Road, Ridgefield

    Complete corridor rebuild with sidewalks, bike lanes, center median/turn lanes, culvert replacement at Gee Creek and safety improvements.

    Local, REET, TIF

    Sidewalks along the route today: 100% · both sides 25%OS-CONNECT, Nov 2026 ↗

    0.1 mi route · 2 crossings (2 unmarked) · 1 curb ramp

    Show on the mapRidgefield 2027-2032 Transportation Improvement Program, p. 2 ↗

Clark County16 projects · $163M

  1. Funded, phase unclear2026–2028Street rebuildWalkingBiking

    NE 179th Street (Vicinity of NE 29th Avenue - Vicinity of NE 50th Avenue)

    Northeast 179th Street, Northeast 29th Avenue to Northeast 50th Avenue

    Roadway improvements on NE 179th Street including bike and pedestrian facilities, retaining walls and stormwater.

    $28.9M · 10% secured · CRF, TIF, Grants/Loans, Local

    Sidewalks along the route today: 15%OS-CONNECT, Nov 2026 ↗

    1.0 mi route · 32 crossings (32 unmarked) · 1 curb ramp

    Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗Clark County 2026-2031 TIP (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗

  2. Funded, phase unclear2027TrailWalkingBikingStreet safety

    NE Hazel Dell Ave and Burnt Bridge Creek Trail Crossing

    Northeast Hazel Dell Avenue at Burnt Bridge Creek Trail

    Trail crossing of NE Hazel Dell Avenue for the Burnt Bridge Creek Trail near 5200-5400 NE Hazel Dell Ave.

    $286K · CRF

    Sidewalks along the route today: 100%OS-CONNECT, Nov 2026 ↗

    0.1 mi route · 3 crossings (3 unmarked) · 0 curb ramps

    Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗

  3. Funded, phase unclear2027WalkingStreet safety

    Truman School Sidewalk

    Northeast 44th Street, Northeast 47th Avenue to Northeast 40th Avenue

    School zone sidewalks, ADA ramps, RRFBs with lighting and school crossing upgrades near Truman School.

    $2.0M · 71% secured · SRTS, TIB, Local

    Sidewalks along the route today: 87% · both sides 2%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 15 crossings (12 unmarked) · 3 curb ramps

    Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 7 ↗RTC Clark County 2027-2030 TIP (adopted), p. 40 ↗

  4. Funded, phase unclear2028Walking

    Highway 99 Sidewalk

    Highway 99, Northeast 110th Street to Northeast 117th Street

    New curb and sidewalk on the east side of Highway 99 filling the gap from NE 110th Street to near NE 117th Street, plus stormwater and signal upgrades.

    $4.0M · 65% secured · TA(UL), Local

    Sidewalks along the route today: 83% · both sides 9%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 16 crossings (10 unmarked) · 2 curb ramps

    Show on the mapClark County 2026-2031 TIP (adopted), p. 5 ↗Clark County 2027-2032 TIP (draft), p. 6 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗

  5. Funded, phase unclear2030Street rebuildWalkingBiking

    NE 179th Street

    Northeast 179th Street, Northeast 15th Avenue to Northeast 26th Avenue

    Widens NE 179th Street to arterial standard with bike lanes and sidewalks, and builds a roundabout at NE 15th Avenue.

    $25.4M · 85% secured · STBG(UL), Local

    Sidewalks along the route today: 17%OS-CONNECT, Nov 2026 ↗

    0.6 mi route · 24 crossings (21 unmarked) · 0 curb ramps

    Show on the mapClark County 2026 Annual Construction Program (adopted), p. 1 ↗RTC Clark County 2027-2030 TIP (adopted), p. 39 ↗

Washougal5 projects · $114M

  1. Funded, phase unclear2027–2030BridgeStreet rebuildWalkingBiking

    32nd Street Rail Overpass Project

    32nd Street, Addy Street to F Street, Washougal

    New rail overpass at 32nd Street with rebuilt roundabout intersections including sidewalks and bicycle facilities.

    $90.0M · 98% secured · STBG(UL), DEMO, Railroad Crossing Elimination Grant, MAW, Local

    Sidewalks along the route today: 100% · both sides 95%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 24 crossings (15 unmarked) · 2 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 114 ↗

  2. Funded, phase unclear2027WalkingBikingStreet safety

    39th Street Sidewalk: Evergreen Way to J Street

    39th Street, Evergreen Way to J Street, Washougal

    Safe routes to school project with lane narrowing, sidewalks, buffered bike lanes, high-visibility crosswalks with rapid flashing beacons, ADA ramps, speed humps and safety education.

    $2.6M · 85% secured · SRTS, Local

    Sidewalks along the route today: 16% · both sides 5%OS-CONNECT, Nov 2026 ↗

    0.5 mi route · 21 crossings (15 unmarked) · 1 curb ramp

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗

  3. 32nd Street Widening-Middle

    32nd Street, Webster Road to W Street, Washougal

    Widens 32nd Street from Webster Road to W Street with sidewalk, pedestrian crossing improvements, ADA curb ramps, street lights and intersection improvements.

    $17.9M · 8% secured · STBG(UL), Local

    Sidewalks along the route today: 100% · both sides 93%OS-CONNECT, Nov 2026 ↗

    492 ft route · 11 crossings (9 unmarked) · 1 curb ramp

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗

Battle Ground4 projects · $37.9M

  1. Funded, phase unclear2027Street rebuildWalkingBiking

    SE Grace Avenue Phase 2 Improvements

    Southeast Grace Avenue, East Main Street to Southeast Rasmussen Boulevard, Battle Ground

    Realign and widen to three lanes with sidewalks, bike facilities, lighting and a new signal at Main and Grace.

    $12.1M · 61% secured · STBG(UL), TIB, Local

    Sidewalks along the route today: 35% · both sides 3%OS-CONNECT, Nov 2026 ↗

    0.4 mi route · 23 crossings (19 unmarked) · 6 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 67 ↗

  2. Funded, phase unclear2027–2028Street rebuildWalkingBiking

    SR 503 to N Parkway Avenue Collector (NW 5th Street)

    Northwest 5th Street, SR 503 to Parkway Avenue, Battle Ground

    Construct a new urban neighborhood collector with sidewalks and bike lanes, storm drainage, landscaping and signing.

    $4.5M · 95% secured · CWA, Local

    Sidewalks along the route today: 100% · both sides 100%OS-CONNECT, Nov 2026 ↗

    0.3 mi route · 18 crossings (14 unmarked) · 8 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 39 ↗

  3. Funded, phase unclear2028Street rebuildWalkingBiking

    SW Eaton Boulevard Improvements

    Southwest Eaton Boulevard, SR 503 to Southwest 20th Avenue, Battle Ground

    Reconstruct SW Eaton Boulevard to three lanes with bike lanes and sidewalks, add signal at SW 20th Avenue and rebuild signal at SR 503.

    $16.2M · 86% secured · STBG(UL), Other, Local

    Sidewalks along the route today: 2%OS-CONNECT, Nov 2026 ↗

    0.5 mi route · 10 crossings (4 unmarked) · 2 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 68 ↗

WSDOT2 projects · $5.0B

  1. Funded, phase unclearMegaproject, not in the page total2027–2029BridgeTransitWalkingBiking

    I-5 Columbia River Bridge Replacement

    I-5, Vancouver

    Design and construction of new I-5 bridges over the Columbia River accommodating highway, transit and active transportation, and removal of the existing Interstate Bridge.

    $5.0B · 96% secured · Discretionary (Mega), NHPP, MAW, Local

    Sidewalks along the route today: 0%OS-CONNECT, Nov 2026 ↗

    325 ft route · 0 crossings · 0 curb ramps

    Show on the mapRTC Clark County 2027-2030 TIP (adopted), p. 41 ↗

Other agencies2 projects · $2.0M

La Center1 project · $8.6M